Similar Projects
Big Papio Trail Old Mill Dodge Fema Restoration Package 2
Infrastructure
Bidding
$2,000,000 est. value
Omaha, NE 68139

2022 Concrete Pavement Repair and Curb Inlet Cover
Infrastructure
Bidding
$65,000 est. value
Omaha, NE

Lake Cunningham Village Paving - Phase II
Infrastructure
Post-Bid
Omaha, NE

Omaha Beltline Trail - Phase 01
Infrastructure
Post-Bid
Omaha, NE

Corby Street Public Improvements
Infrastructure
Results
Omaha, NE 68110

Charles Street Public Improvements - Phase 2
Infrastructure
Results
Omaha, NE 68110

Brook Park Paving Maintenance 2022
Infrastructure
Bidding
$99,632 est. value
Omaha, NE

Coventry Sidewalk Improvements
Infrastructure
Post-Bid
Omaha, NE

Standing Bear Boat Ramp Asphalt Repairs - 2021
Infrastructure
Results
Omaha, NE 68164

Paving Reconstruction 2022 (Stone Creek)
Infrastructure
Bidding
$120,000 est. value
Omaha, NE

SID 404 - 2022 Paving Reconstruction
Infrastructure
Post-Bid
Omaha, NE

28th and Charles Street Redevelopment
Infrastructure
Results
Omaha, NE 68131

Andresen Meadows SID 555, Douglas County - 2022 Street Reconstruction
Infrastructure
Bidding
$1,300,000 est. value
Omaha, NE

Statewide On-Call Milling
Infrastructure
Post-Bid
Less than $5,000,000 est. value

2021 Ralston Street Patching
Infrastructure
Results
Ralston, NE

Last Updated 06/23/2022 04:27 AM
Project Title

Stratford Park SID 528, Douglas County - 2022 Street Reconstruction

Physical Address View project details and contacts
City, State (County) Omaha, NE   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $132,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed in this improvement shall consist of the removal of the existing pavement and replacement of Portland Cement Concrete pavement of varying widths with a minimum thickness of seven inches for large areas and nine inches for small areas, together with integral curb and gutter, construction of four inch thick sidewalk, replacement of sidewalk and curb ramps, necessary removals, subgrade preparation, and necessary appurtenances for a completed improvement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents