Similar Projects
Andover High Central Heating Plant Upgrade - SCH-5 - Town of Andover -
Renovation, Alteration
Conception
$800,000 est. value
Andover, MA 01810

Andover High School - Collins Center - Install New Roof Top Units - FAC-7 - Town of Andover
Alteration
Conception
$500,000 est. value
Andover, MA 01810

HVAC Control Work
Alteration
Bidding
$100,000 est. value
Marblehead, MA

Air Vent Cleaning of Aviation Hangars
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

Stanley School Exhaust
Results
Less than $120,000 est. value
Swampscott, MA 01907

Fox Center Community Action for HVAC System Replacement
New Construction, Demolition
Post-Bid
Haverhill, MA 01830

Range Hood Exhaust Fans - General Bid
Results
Less than $221,660 est. value
Gloucester, MA

Essex County H.O.C. 80 Bed and Voc Tech Buildings Facade/HVAC
Post-Bid
Less than $3,155,494 est. value
Middleton, MA

Gymnasiums Air Handler Replacement Project
Results
Less than $682,000 est. value
Andover, MA 01810

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Boiler Maintenance Services
Term Contract
Results
Less than $126,000 est. value
North Andover, MA

Mechanical Services, Three Years, DMH Northeast Area
Term Contract
Post-Bid
$120,000 est. value

On-Call HVAC Repair Services at City and School Facilities
Results
Haverhill, MA

Reported 06/21/2022 02:48 PM
Project Title

West Middle Air Conditioning - Town of Andover

Physical Address View project details and contacts
City, State (County) Andover, MA 01810   (Essex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $4,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Funds will be requested to design and engineer, then install, air conditioning throughout West Middle School. This would be a two-phase project, with initial funding for design and engineering, followed by construction later to allow adequate time for the design phase. This project is in included in the Town of Andover FY 2023 - 2028 Capital Improvement Plan (CIP). As of June 17, 2022, further details regarding design and construction have not been identified.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents