Similar Projects
Desilt Drainage Structures
Bidding
$85,000 est. value
FL

Desilt Box Culverts with Repairs
Bidding
$750,000 est. value

Design-Build Services for Moultrie Trails Area Drainage Improvements
Results
Less than $1,997,028 est. value
Saint Augustine, FL 32084

Dredged Material Management Area Du-2 and SJ-1 Shoreline Improvements
Results
Less than $1,467,747 est. value

Winton Circle Drainage Improvements
Bidding
FL 32086

Clean and Desilt Box Culverts
Results
Less than $250,000 est. value

Kings Road Drainage Improvements
Bidding
FL 32086

Santa Maria Boulevard Drainage Improvements
Results
Less than $2,173,000 est. value
Saint Augustine, FL 32084

3rd Alley Ditch Drainage Improvements
Results
Saint Augustine, FL 32080

Deep Creek Conservation Area - Ditch Blocks Installation
Results
Less than $59,310 est. value
FL

Coastal Storm Risk Management Project, South Ponte Vedra and Vilano Beach, St. Johns County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

Second Call - Halfmile Creek Mitigation Area, Trail Road Improvements and Low Water Crossing
Results
Less than $22,000 est. value
FL

Fabrication and Installation of Removable Flood Barriers for the Waste Water Treatment Plant
Results
Saint Augustine, FL

FEMA Project - Old A1A South Berm Restoration
Results
Less than $1,152,098 est. value
FL

CDBG-DR Project: Avenue D and Tart Road Drainage Improvements
Results
Less than $680,364 est. value
Saint Augustine, FL 32084

Last Updated 09/14/2020 10:37 AM
Project Title

Marsh Flow-Way C1 and C2 Maintenance Improvements

Physical Address View project details and contacts
City, State (County) FL   (Saint Johns County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,760,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the C1 and C2 cells, the contractor shall clear the cells of vegetation, rough grade the cells, remove accumulated material from the internal ditches within the cells, reshape the internal ditches, widen two strategically located internal ditches within each cell, remove material from the inflow and outflow channels for each, fill in major short cuts with onsite or imported material, and fine grade the cells.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents