Similar Projects
WIC Center/Dunbar Daycare Roof Replacement - 197-307 - City of Baltimore
Renovation, Infrastructure
Conception
$300,000 est. value
Baltimore, MD 21205

Windlass Run Shopping Center
New Construction
Conception
$8,000,000 est. value
Bowleys Quarters, MD 21220

Almost Home Daycare
New Construction - 7,200 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Nottingham, MD 21236

Loyola Early Learning Center Addition
Addition - 25,000 SF
Design
Baltimore, MD 21202

RFP D/B - Various Childcare Facilities
Renovation
Bidding
$95,000 CJ est. value
Rockville, MD 20850

The Greensboro Judy Center Project
New Construction - 7,375 SF
Post-Bid
Greensboro, MD 21639

P3005, Design Build, Child Development Center, Joint Base Andrews, Camp Springs, MD
New Construction, Demolition - 48,296 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Camp Springs, MD

Limited to NAVFAC Washington SB MACC Holders for Joint Base Andrews P-3005 Child Development Center
New Construction
Results
MD

The Goddard School
New Construction - 14,465 SF
Construction
$1,500,000 est. value
North Bethesda, MD 20852

Primrose School
New Construction - 12,000 SF
Construction
$2,400,000 est. value
Silver Spring, MD 20906

Tribeca at Camp Springs - Day Care Center
New Construction, Renovation - 7,700 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Camp Springs, MD 20746

Celebree Of Rockville
Build-Out - 13,510 SF
Pending Verification
Rockville, MD 20852

Hammer Hill Daycare Facility
New Construction, Infrastructure - 13,600 SF
Design
$2,700,000 CJ est. value
Clarksburg, MD 20871

Lightbridge Academy & Vanilla Box
Renovation - 10,275 SF
Post-Bid
Lutherville, MD 21093

Bright Horizons Child Care Center
New Construction - 18,696 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Baltimore, MD

Last Updated 09/19/2022 08:08 AM
Project Title

Wheatley (H.Winship) Early Childhood Center - 16.017 - Prince George's County Public Schools

Physical Address View project details and contacts
City, State (County) Capitol Heights, MD 20743   (Prince Georges County)
Category(s) Education
Sub-Category(s) Pre-School/Daycare
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $14,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Existing Information: H. Winship Wheatley Regional was constructed in 1970 with additions in 1978 and 1983. The HVAC system is split between the lower (1970) and upper (1978/1983) campuses. The lower campus HVAC system is composed of two hot water boilers that serve a two-pipe system. Downstream equipment consists of heating only incremental units (fan coil units, radiators, convectors and unit ventilators) and all cooling is provided by direct expansion unit ventilators, split systems and/or packaged rooftop units. Two former pod areas are now served by gas fired packaged rooftop units and convectors/fan coil units have been left in place. Air conditioning in the remainder of the lower campus with exception of the gym is provided by window AC units, or remote condensers in unit ventilators. The lower campus gym is served by two ceiling hung heating/ventilating units. The upper campus is served by a separate boiler room with a gas fired hot water boiler. This portion of the campus is also served by a 50 Ton water cooled chiller and cooling tower. Water is delivered by a two-pipe system. Downstream equipment consists of unit ventilators, air handling unit (natatorium) and fan coil units. The upper campus gym is served by two gas fired packaged rooftop units. Original controls are pneumatic with some controls having been upgraded to DDC with replacement units. Scope of Work Overview: The scope of work is to replace the upper campus boiler, piping, downstream units (as identified above) in the upper campus, and provide new dedicated outside air units to provide preconditioned outside air to the entire facility. Scope of work also includes full controls upgrade. The existing sprinkler system will need to be extended to the rest of the facility or replaced in its entirety. A full fire alarm upgrade will be required as well. Affected areas in scope would include full ceiling with LED lighting replacement. Additional work also includes flooring replacement, paint, and IT security infrastructure replacement. The project is included in the 2023-2028 capital improvement plan (CIP). As of September 19, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents