Similar Projects
Hoffman LHC302515S Inline Stainless
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Metal Beam Guard Fence
Post-Bid
Philadelphia, PA

Repair Of Packer #1 - Steel Fabrication
Results
Philadelphia, PA

Rolling Work Platform, Steel, Dual
Results
Less than $25,000 est. value
Philadelphia, PA

Bushing BYK-RAK B044AC Stainless Steel
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Steel .375" X 6` .375" All Threaded Rod
Results
Philadelphia, PA

Stainless Steel Sheets 28 Gauge
Post-Bid
Philadelphia, PA

Stainless Steel Expansion Joint
Results
Philadelphia, PA

Railroad Track Material for Procurement
Renovation
Post-Bid
Duquesne, PA 15110

Steel Procurement
Results
Philadelphia, PA

#9 Expanded Metal Flattened Hot Rolled
Post-Bid
Philadelphia, PA

Berridge Shop Sheet Metal
Results
Less than $25,000 est. value
Philadelphia, PA

Fabricate 36" Aluminum Bridge Plates
Results
$25,000 to $100,000 est. value
Philadelphia, PA

304 Stainless Steel Sheet
Results
Less than $25,000 est. value
Philadelphia, PA 19107

Pry Bar 66" 1-1/2" Square Painted Steel
Results
Philadelphia, PA

Last Updated 12/19/2019 10:37 AM
Project Title

Flash Butt Welding; Suburban and City Rail

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19107   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Steel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Eliminate approximately 698 rail joints on SPETA’s City and Suburban Rail Divisions through electric flash butt welding hi-rail vehicle. SEPTA has 62 ½” broad gage and 56 ½” standard gage on their City/Suburban Transit Division. Contractor’s equipment will only have to accommodate the standard gage track. All broad gage track welding will be performed on either field side of track or on street running territory. Work will be scheduled for 2 nonconsecutive weekends with 14 hrs shifts. SEPTA will Pay Vendor two separate Mob/Demob chargers.

Details

Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents