Similar Projects
Crack Sealing Contract
Infrastructure
Conception
$4,300,000 CJ est. value
N Merrick, NY 11566

I 495 Pavement Rehab Ex 32 to 48
Infrastructure
Conception
$35,000,000 CJ est. value
Old Westbury, NY 11568

WSP at Old Country Rd Ramp Impvt
Infrastructure
Design
$4,150,000 CJ est. value
Carle Place, NY 11514

AutoZone #6872 / Westbury
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Westbury, NY 11590

Construction of the Well 33 Pump Station - Contract C17-22 - General Construction
New Construction, Infrastructure
Bidding
$598,900 CJ est. value
Woodbury, NY 11791

Paving Services
Infrastructure
Bidding
$300,000 CJ est. value
North New Hyde Park, NY 11040

Construction of the Well 33 Pump Station - Contract C18-22 - Electrical Construction
New Construction, Infrastructure
Sub-Bidding
$300,000 CJ est. value
Woodbury, NY 11791

Construction of the Well 33 Pump Station - Contract C19-22 - Mechanical Construction
New Construction, Infrastructure
Sub-Bidding
$400,000 CJ est. value
Woodbury, NY 11791

Clean Fill Removal Services
Alteration
Post-Bid
Elmont, NY 11003

Replacement Of The Synthetic Turf Fields
Alteration
Post-Bid
Massapequa, NY 11758

2021-2022 Athletic Field Reconstruction
New Construction
Results
Glen Head, NY 11545

Rockville Centre Police Station - Site Construction
Infrastructure
Results
Rockville Centre, NY 11570

X-Golf at Samanea New York Mall
Build-Out - 6,300 SF
Pending Verification
Westbury, NY 11590

81 Seaview Boulevard Skating Rink
Renovation
Pending Verification
Port Washington, NY 11050

NY 107 Over I495 Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Massapequa, NY 11758

Last Updated 10/06/2022 08:26 AM
Project Title

Fitness Center First Floor Alterations and Second Floor Addition -Plainedge High School - Contract G-1: General Construction

Physical Address View project details and contacts
City, State (County) Massapequa, NY 11758   (Nassau County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $5,330,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, renovation and addition to an educational facility in Massapequa, New York. Completed plans call for the addition of a 208,750-square-foot, two-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility. **As of May 10, 2022 The General Construction Contract was awarded to Fortunato Sons Contracting. The mechanical, electric and plumbing portion of the project will be re-bid on 5/19/22 Bids must be presented on the standard bid proposal form(s) in the manner designated therein and as required by the Specifications. All bids must be addressed to the Purchasing Agent, Justine Stringer, District Administration Building, 241 Wyngate Drive, N. Massapequa, N.Y. 11758. All bids shall be sealed and in an opaque envelope that is distinctly marked on the outside as follows: "Bid #21-002, Fitness Center First Floor Alterations and Second Floor Addition at Plainedge High School" as required by the Bid Specifications. The name of the bidder, bidders address, and the name of the contract, and/or contracts being bid must also appear on the outside of the envelope. All bid addenda will be transmitted to registered plan holders via email and will be available at the above. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The bid deposit for hard copies will be returned upon receipt of plans and specifications, in good condition, within thirty days after bid date, except for the lowest responsible bidder, whose check will be forfeited upon the award of the contract. Prospective bidders are strongly encouraged to attend. Knowledge of the site is crucial to obtain a proper understanding of the Work. All bidders must be fully familiar with the site. Bidders shall visit the sites of proposed work and be fully familiarized with conditions as they exist, as well as the character of the operations to be carried on under the proposed contract. All visits must be scheduled & coordinated with Brett Prochazka, Director of Facilities, at (516) 992-7422 or by email to Brett.Prochazka@plainedgeschools.org. Each bid must be accompanied by a certified check payable to PLAINEDGE UNION FREE SCHOOL DISTRICT or by a Bid Bond in an amount equal to ten percent (10%) of the bid conditioned as set forth in the "Information for Bidders" of the Bid Specifications. All bid security, except those of the three lowest bidders will be returned within ten (10) days after bids are submitted. The bid security provided by the three lowest bidders will be returned after the execution of the Trade Contract. The District will require the successful bidder to provide separate Performance and Labor & Materials Payment Bonds in the amount of the contract price and in the form specified in the Bid Documents. Each Bidder shall prepare their bid proposal, along with a bid security, in accordance with the terms and subject to the conditions set forth in the "Information for Bidders" and Bid Specifications. Attention of bidders is particularly called to the minimum wage rates to be paid under the contracts. Wages to workers, laborers and mechanics employed to work on this project shall be paid in accordance with Section 220 of the Labor Law and in accordance with the Prevailing Rate Schedules found in the Project Manual. Proof of such payments will be required. The District reserves the right to award a contract to the lowest responsible bidder providing the required security within forty-five (45) days of the date opening of the bids. To the fullest extent allowed by law, the District further reserves the right to reject bids that contain conditions, omissions, exceptions or modifications, or in its sole discretion to waive any irregularities in the bids, or to reject any or all bids, or to accept any bid which in the opinion of the District is in its best interest. Any bid may be withdrawn without prejudice prior to the official bid opening time or any publicized postponement thereof. Any bid received after the time and date stated above will be returned to the bidder unopened. Bidders are solely responsible for the arrival of each bid at the School District Administration Office by the appointed time, regardless of the means of delivery SECOND FLOOR BUILDING ADDITION TO INCREASE EXISTING FITNESS SPACE CAPACITY AND MODERNIZE FACIUTY. INTERIOR ALTERATCNS TO mODERIRZE COSTING MESS SPACES ANDADJACENT CORRIDOR. NEW MECHANICAL VENTILATION. HEATING AND COOING SYSTEMS TO BE INTEGRATED 4TO EXISTING BMS SYSTEM. NEW ENERGY-EFFICIENT UGHTING THROUGHOUT. WORK INCLUDES THE INSTALLATION OF NEW CONVEYING SYSTEM (LULA ELEVATOR). SCOPE INCLUDES INCREASES TO EXISTING BUILDING AREAS AND VOLUMES AND CHANGES TO ME EXISTING BUILDING LAYOUT. PROJECT NO. PD G003-06SED JCB#: 20-46759 21-002

Details

2 Stories Above Grade, 208,750 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents