Similar Projects
40th-San Pablo Transit Hub and 40th Street Reconstruction - City of Emeryville
Infrastructure
Conception
$10,787,000 est. value
Emeryville, CA 94608

Castro Valley Boulevard Corridor Improvements from San Miguel Avenue to Stanton Avenue - Alameda County
Infrastructure
Conception
$1,250,000 est. value
Castro Valley, CA 94546

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Sidewalk Repair Project
Alteration
Design
$500,000 to $1,000,000 est. value
Dublin, CA 94568

Precast Concrete Pavement, Electronic Toll System, JPCP, CB and Structural Concrete
Infrastructure
Bidding
$170,000,000 est. value
Sunol, CA 94586

East Bay Greenway Segment II (Seminary Avenue to 69th Avenue)
Infrastructure
Bidding
$3,633,448 CJ est. value
Oakland, CA 94621

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

Accessible Improvement Program - Phase 1
Infrastructure
Results
$1,000,000 to $5,000,000 est. value
Oakland, CA

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Results
$23,400,000 est. value
CA

Sunol Ridge Roadway Reinforcement - Alameda County
Alteration
Conception
$1,000,000 est. value
Castro Valley, CA 94552

Apply High Friction Surface Treatment
Infrastructure
Design
$3,502,000 est. value
Sunol, CA

2022 Citywide Pavement Rehabilitation - As Needed Paving Services
Infrastructure
Bidding
$13,486,600 est. value
Oakland, CA

Airport Pavement
Infrastructure
Post-Bid
Hayward, CA 94541

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Last Updated 07/22/2022 05:41 AM
Project Title

Annual Street Rehabilitation and Preventive Maintenance Project Fiscal Year 2021 - 2022

Physical Address View project details and contacts
City, State (County) Emeryville, CA 94608   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $1,380,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project entails street rehabilitation and preventive maintenance on various streets throughout the City of Emeryville. The specific streets included in this project are: 41st Street (San Pablo Avenue - Adeline Street), 43rd Street (San Pablo Avenue - Adeline Street), 45th Street (San Pablo Avenue - Adeline Street), 47th Street (San Pablo Avenue - Adeline Street), 48th Street (San Pablo Avenue - City Limits), Salem Street (43rd Street - 45th Street), Essex Street (43rd Street - 45th Street), Doyle Street (45th Street - Steve Dain Drive), Steve Dain Drive (Doyle Street - San Pablo Avenue). This project generally includes, but is not limited to, the reconstruction and preservation of asphalt pavement; replacement of traffic striping and markings; installation of signs; reconstruction of PCC sidewalks, driveways, medians, curb, gutters, and curb ramps; and reconstruction of existing bulbout planters. In regards to asphalt pavement removal and replacement, the project requires various methods including the contractor to provide a full dig out, replace the existing asphalt, and construction of new pavement section

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents