Similar Projects
Last Updated | 07/22/2022 05:41 AM |
Project Title | Annual Street Rehabilitation and Preventive Maintenance Project Fiscal Year 2021 - 2022 |
Physical Address | View project details and contacts |
City, State (County) | Emeryville, CA 94608 (Alameda County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results, |
Bids Due | View project details and contacts |
Estimated Value | $1,380,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project entails street rehabilitation and preventive maintenance on various streets throughout the City of Emeryville. The specific streets included in this project are: 41st Street (San Pablo Avenue - Adeline Street), 43rd Street (San Pablo Avenue - Adeline Street), 45th Street (San Pablo Avenue - Adeline Street), 47th Street (San Pablo Avenue - Adeline Street), 48th Street (San Pablo Avenue - City Limits), Salem Street (43rd Street - 45th Street), Essex Street (43rd Street - 45th Street), Doyle Street (45th Street - Steve Dain Drive), Steve Dain Drive (Doyle Street - San Pablo Avenue). This project generally includes, but is not limited to, the reconstruction and preservation of asphalt pavement; replacement of traffic striping and markings; installation of signs; reconstruction of PCC sidewalks, driveways, medians, curb, gutters, and curb ramps; and reconstruction of existing bulbout planters. In regards to asphalt pavement removal and replacement, the project requires various methods including the contractor to provide a full dig out, replace the existing asphalt, and construction of new pavement section |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |