Similar Projects
Replacement Of R142 Dmcu
Term Contract
Bidding

Installation / Replacement Of Decoration / Privacy Film For Store Fronts At Twenty-Two (22) LNA Service Stations
Term Contract
Bidding

Door Repair and Maintenance Services
Term Contract
Post-Bid
White Plains, NY 10601

Overhead Garage Door Maintenance
Post-Bid
White Plains, NY

Y1DZ--620-17-118 Building 17 Egress
Results
$500,000 to $1,000,000 est. value
Montrose, NY 10548

Glass Repair, Replace and Installation
Term Contract
Results
White Plains, NY 10603

Overhead Door Repairs
Post-Bid
NY

Window Replacement and Masonry Repair at SJ Preston Elementary School
Results
Harrison, NY 10604

Maintenance and Repairs to Overhead Doors As Needed
Term Contract
Post-Bid
Yonkers, NY

Eastchester Public Library - Window Replacement
Results
Eastchester, NY 10538

Installation of Entry Doors
Post-Bid
South Salem, NY 10590

Loading Dock Overhead Door Replacement Project
Term Contract
Results
White Plains, NY 10601

Impact Resistant Window Film On Windows & Doors
Renovation
Post-Bid
White Plains, NY 10606

Doors
Results
White Plains, NY

Garage Door Repairs
Post-Bid
NY

Reported 03/23/2022 12:00 AM
Project Title

Window Replacement Project

Physical Address View project details and contacts
City, State (County) Verplanck, NY 10596   (Westchester County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the replacement of 30 windows at the verplanck community center, located at 210 6th Street, Verplanck. Two windows located in the restrooms casement type the remain twenty eight windows 66 casement bottoms solid top windows will be of vinyl material. The top and bottom of the window will have grid work in between glass to duplicate the original, and half screens. Prices shall include window replacement type and installation aluminum wrap on exterior and finished trim work on inside, glass shall be insulated, series 400 windows to have interior locks.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents