Similar Projects
Kilmayne Place Senior Living
New Construction, Infrastructure - 86,000 SF
Conception
$32,000,000 CJ est. value
Cary, NC 27511

Board of Elections Paving - Wake County
Infrastructure
Conception
$370,000 est. value
Raleigh, NC 27610

Sportsmanship Crossing Development / Holly Springs
New Construction, Infrastructure - 100,000 SF
Design
$50,000,000 CJ est. value
Holly Springs, NC 27540

New Middle School (M-19) and High School (HS-11) - Wake County Public Schools
New Construction, Infrastructure - 300,009 SF
Design
$128,149,254 CJ est. value
Morrisville, NC 27560

Bowling Road Elementary School - Wake County Public Schools
New Construction, Infrastructure - 134,000 SF
Sub-Bidding
$54,544,624 CJ est. value
Fuquay Varina, NC 27526

Neuse River Resource Recovery Facility (NRRRF) Bioenergy Recovery Project (BERP) - BP 12 - Sidestream Treatment
New Construction, Infrastructure
Post-Bid
$7,000,000 CJ est. value
Raleigh, NC 27610

Request to Prequalify Vendors For Residential Asbestos Abatement Services
Term Contract, Infrastructure
Post-Bid
$200,000 CJ est. value
Raleigh, NC 27603

Archives and History Building Foundation Repairs and Drainage Improvements
Renovation, Infrastructure
Results
$965,000 CJ est. value
Raleigh, NC 27601

East Wake Transfer Station Repairs
Infrastructure
Results
$1,971,000 CJ est. value
Raleigh, NC 27610

Hayes Barton Place
New Construction, Infrastructure - 587,640 SF
Construction
$157,900,000 CJ est. value
Raleigh, NC 27608

Martin Pond Road Water Main Extension
Infrastructure
Construction
$3,571,596 CJ est. value
Wendell, NC 27591

Wilder's Grove Retail
New Construction, Infrastructure - 11,000 SF
Pending Verification
$3,500,000 CJ est. value
Raleigh, NC 27610

The Exchange Raleigh - Future Phases
New Construction, Infrastructure - 125,000 SF
Pending Verification
$850,000,000 CJ est. value
Raleigh, NC 27609

Middle Creek Greenway - Town of Cary
Infrastructure
Conception
$2,000,000 CJ est. value
Cary, NC 27513

Rex Road Elementary School (E-52) - Wake County Public School System (WCPSS)
New Construction, Infrastructure - 133,364 SF
Design
$52,262,682 CJ est. value
Holly Springs, NC 27540

Last Updated 09/27/2023 12:02 PM
Project Title

RFQ Contractor - Prime Contractors for Residential Construction Services

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27601   (Wake County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The North Carolina Office of Recovery and Resiliency (NCORR), a division of the North Carolina Department of Public Safety (DPS), is seeking to develop and maintain a list of prequalified prime construction contractors to perform, or cause to be performed: rehabilitation, demolition, and/or elevation/mitigation services in connection with the administration of U.S. Department of Housing and Urban Development ("HUD") and Community Development Block Grant-Disaster Recovery ("CDBG-DR") of eligible structures through NCORR recovery programs. At times, there may be a need to proceed with awarding a contract without the use of the competitive bidding process. This process is known as assignment. The Program Delivery Office will utilize the prequalified list for assignment work. A project or set of projects with a total or aggregate total under $250,000 may be assigned to a General Contractor. Project assignments are based upon General Contractor scorecards, capacity, and location. The Program Delivery Office will evaluate all these factors to properly and fairly assign projects in the best interest of the state. Pursuant to NCORR's Special Delegation construction assignment contracts can be entered into up to $250,000 without competitive bidding. This Prequalified General Contractor List is not a contract. The individual Assignment Contract ("Assignment") will be the contract. General Contractors that submit an Application to be added to the General Contractor Prequalified List will be expected to accept the terms and conditions of the Contract. By submitting this Application, the Vendor acknowledges they have reviewed the sample Assignment Contract, including the terms and conditions, located Written questions regarding this Request for Prequalification for General Contractors will be accepted on an ongoing basis. Questions shall be emailed to Construction@ReBuild.NC.Gov; copy angie.dunaway@ncdps.gov. Responses to questions will be posted to online It is NCORR's intent to compile all questions the last day of each month and post an Addendum (if questions are received) the first week of the following month. No information provided orally shall be considered authoritative or binding. Vendors shall rely only on written material contained in an Addendum to this RFPQ.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents