Similar Projects
Taft Elementary School Parking Lots
Infrastructure
Post-Bid
$200,000 est. value
Neenah, WI 54956

Concrete Pavement and Sidewalk Repair
Infrastructure
Post-Bid
$247,000 est. value
Neenah, WI

Tribal Heritage Crossing - STH 21 Multi-Modal Trail
Results
Oshkosh, WI

Concrete Pavement and Sidewalk Repairs
Infrastructure
Results
Neenah, WI

Lourdes Academy Parking Lot
Demolition, Infrastructure
Construction
Oshkosh, WI 54902

Concrete Services
Infrastructure
Post-Bid
$2,000,000 est. value
Oshkosh, WI

Parking Lots Construction and Re-Striping
Infrastructure
Results
Oshkosh, WI

Pioneer Riverwalk Phase I
Infrastructure
Results
Oshkosh, WI

Jewelers Park Drive Trail
Infrastructure
Results
Neenah, WI

Algoma Boulevard and Vine Street Reconstruction
Infrastructure
Results
Oshkosh, WI 54903

Concrete Sidewalk (New and Rehabilitation)
Infrastructure
Results
Oshkosh, WI

East Lincoln Avenue and Rosalia Street Reconstruction
Infrastructure
Results
Oshkosh, WI 54901

Oregon Street Sanitary Interceptor Sewer Construction
Infrastructure
Results
Oshkosh, WI 54902

Witzel Avenue Sanitary Sewer Construction
Infrastructure
Results
Oshkosh, WI

Storm Sewer Laterals and Various Locations
Infrastructure
Results
Oshkosh, WI

Reported 07/15/2022 02:47 PM
Project Title

New Downtown Parking Ramp - City of Neenah

Physical Address View project details and contacts
City, State (County) Neenah, WI   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a sidewalk / parking lot in Neenah, Wisconsin. Conceptual plans call for paving for a sidewalk / parking lot. A detailed scope of work has not been discloseed. As of July 22, 2022, this project is in the conceptual phase. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents