Similar Projects
Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Bidding
Anthony, NM 88021

Construction Services Antonio Lane Sewer Line
Bidding
Santa Fe, NM 87501

Wastewater System Improvements
Post-Bid
Loving, NM

Restoration of Existing Sewer Lines and Manholes
Post-Bid
Ruidoso, NM

West Main Street Water and Sewer Improvements
Results
$3,600,000 est. value
Farmington, NM

2018 Sewer Improvements Project
Results
$514,841 est. value
Gallup, NM

Industrial Park Loop Improvement Project
Bidding
$2,300,000 est. value
Rio Rancho, NM

Navajo Head Start Grease Trap Pumping and Cleaning Services and Provide Relocation and Repairs for Grease Traps
Term Contract
Post-Bid
Chinle, Fort Defiance, Kayenta, Tuba City, AZ - Crownpoint, Shiprock, NM

Mcdowell Road Wastewater Collection System Project
Results
Less than $216,400 est. value
Mesilla, NM

Water and Wastewater Systems Maintenance and Repair Services
Bidding
Las Cruces, NM 88007

Septage Lagoons Construction
Post-Bid
Estancia, NM

Installation of a Water and Sewer Lines for Residential Construction
Results
Bernalillo, NM

Tesuque Pueblo Wastewater Expansion
Post-Bid
Less than $2,500,000 est. value
Tesuque Pueblo, NM 87505

Vista Aurora Subdivision Sanitary Sewer Line Construction Project
Results
NM

Construction of the Water Improvements - Phase 3B Project
Post-Bid
Taos, NM

Last Updated 02/13/2019 11:08 AM
Project Title

Construction Services for Bayard Phase 2B Effluent Reuse Project

Physical Address View project details and contacts
City, State (County) Bayard, NM   (Grant County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1. 200,000 gallon ground storage tank. 2. Booster pump building. 3. Tank / Booster Pump Building site development. 4. Site work at tank/booster pump building site. 5. Approximately 3,245 LF of 10” PVC transmission line. 6. Main service lines; B 380 ft. 6” PVC; C 545 ft. 4” PVC; D 635 ft. 4” PVC. 7. Tank overflow/drain line E; 380 ft 6” PVC. 8. Service lines from existing meters to the Snell Middle School, Bayard Elementary School, and City ball field effluent application areas.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents