Similar Projects
Green Leaf Community at Childress
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Atlanta, GA 30311

3356 Peachtree Road Buckhead Residential Tower
New Construction, Infrastructure
Conception
$75,000,000 CJ est. value
Atlanta, GA 30326

FIFTY Tower
New Construction, Infrastructure
Design
$450,000,000 CJ est. value
Atlanta, GA 30308

First United Methodist Church Mixed-use Development
Demolition, New Construction, Infrastructure, Build-out, Renovation
Design
$50,000,000 CJ est. value
Atlanta, GA 30308

Physical Activity Center Expansion
Addition, Demolition, Renovation, Infrastructure - 4,987 SF
Post-Bid
$5,000,000 CJ est. value
Roswell, GA 30075

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Stacks Road over CSX Railroad - Abutment Wall Repairs and Roadway Drainage Improvements
Results
College Park, GA 30349

980 Crest Valley Drive Stormwater Improvement Project
Infrastructure
Results
$279,562 CJ est. value
Atlanta, GA 30327

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

Medlock Shops / Johns Creek
New Construction, Infrastructure - 6,200 SF
Construction
$1,600,000 CJ est. value
Johns Creek, GA 30097

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

The Proctor
New Construction, Infrastructure - 142,000 SF
Design
$55,000,000 CJ est. value
Atlanta, GA 30318

RFP Design - Construction Professional (CP) Services for Atlanta Unbound Academy, Construction of New K-8 School
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
College Park, GA 30337

T32-D7-PCC-District Wide-122083
Infrastructure
Results

Last Updated 04/03/2023 07:03 PM
Project Title

Riverside Drive Stormwater Mitigation Project

Physical Address View project details and contacts
City, State (County) Sandy Springs, GA 30328   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $558,237 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The existing auxiliary concrete spillway for North Harbor Lake at 600 North Harbor Drive is currently failing, resulting in roadway flooding. The downstream slope has recently experienced erosion behind the retaining wall. This project involves replacing the existing 1420 square-foot concrete spillway and 48" area inlet with a 1760 square-foot concrete spillway and 84" drop inlet. The project also involves installing 190 linear feet of poured curb and 1730 square feet of grouted riprap as overflow measures. Associated work with the spillway installation includes minor grading and a geotechnical inspection of the saturated subgrade. Associated stormwater infrastructure work includes the modification of an existing junction box, and removal and reinstallation of a 12" HDPE storm pipe. Questions are due no later than March 8, 2023, 5:00 p.m Complete all Work within one hundred twenty (120) calendar days All questions or requests for clarification must be sent via Bonfire under Message - Opportunity Q&A: https://sandysprings.bonfirehub.com/projects/75373/details are due nolater than October 17, 2022, 5:00 p.m. Questions received after this date and time may not be answered.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents