Similar Projects
Beautification and Landscape Improvements
Alteration
Bidding
TN

Landscaping Improvements Project
Alteration
Bidding
Alcoa, TN 37701

Herbicide Treatment for City Drainage Canal Right-Of-Ways
Post-Bid
Chattanooga, TN 37402

Trees
Post-Bid
Chattanooga, TN 37400

USDA Forest Service Southern Region 8- Disaster Recovery
Results
$250,000 to $7,000,000 est. value

USDA Forest Service Southern Region 8- Disaster Recovery
Results
$250,000 to $7,000,000 est. value

HCS Custodial and Grounds Services
Term Contract
Post-Bid
Chattanooga, TN 37421

Concrete Pathway Installation, Landscaping, Storm Water Structure Modifications, Irrigation System, L.E.D. Pedestrian Lighting, Installation of ADA Compliant Crossing Ramps, Railroad Safety Improvements
Results
Chattanooga, TN

Grounds Maintenance at the Family Justice Center
Term Contract
Post-Bid
Chattanooga, TN

WCS Outsourced Lawncare Services
Term Contract
Results
Franklin, TN

Grounds Maintenance For City Parks
Term Contract
Post-Bid
Chattanooga, TN 37400

Gas Matrix Utility Landscaping
Results
Memphis, TN

Commercial Landscape Maintenance Services
Post-Bid
Hendersonville, TN

Sidewalk Improvements Phases 3 and 4
Results
Shelbyville, TN 37160

Right-of-Way Maintenance
Term Contract
Post-Bid
Goodlettsville, TN

Reported 01/28/2022 12:00 AM
Project Title

Irrigation and Landscape Maintenance Services

Physical Address View project details and contacts
City, State (County) Kingsport, TN   (Sullivan County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Landscape Maintenance Contractor shall provide all materials, equipment, and labor required to perform all tasks identified within these specifications. The landscape Contractor is expected to perform the described work a minimum of every two weeks during the growing season except for the required Spring and Fall clean-ups to be done once a year. Locations • Area 1 – The triangular landscaped bed near the entrance of the Exit 4, I-26/Wilcox Drive ramp • Area 2 – The large existing landscaped bed halfway down the Exit 4 ramp from I-26 towards Wilcox Drive/J. B. Dennis Highway • Area 3 – The landscaped bed around the trees near the end of Exit 4 ramp from I-26 near J. B. Dennis Highway • Area 4 – The median of Wilcox Drive near the intersection of J. B. Dennis Highway • Area 5 – The landscaped bed around the Welcome to Kingsport Sign on the east side of Wilcox Drive near the intersection of J.B. Dennis Highway • Area 6 – The landscaped bed in front of the wetland area on the east side of Wilcox Drive along the north side of J. B. Dennis Highway • Area 7 – The landscaped bed in front of the brick house at the intersection of Wilcox Drive and J. B. Dennis Highway • Area 8 – The landscaped beds on the Northwest side of the intersection of Wilcox Drive and J. B. Dennis Highway • Area 9 - The 911 center located on Unicoi Street (Both inside and outside the fenced area) • Area 10 - The entire landscaped median of Eastman Road • Area 11 – The Landscaped beds on each side East Sullivan at the north side intersection of North Wilcox. • Area 12 – The entire landscaped median of Memorial Blvd. from Fort Henry Drive to Center Street/Warpath Drive • Area 13 – All landscaped and tree planted areas at the interchange of Stone Drive and J.B. Dennis Highway • Area 14 - All landscaped and tree planted areas at the interchange of Memorial Blvd. and J.B. Dennis Highway • Area 15 - All landscaped and tree planted areas at the interchange of Fort Henry Drive and J.B. Dennis Highway • Area 16 – All landscaped and tree planted areas at the intersection of Stone Drive and Netherland Inn • Area 17 – The entire landscaped median of Stone Drive from Eastman Road to Indian Trail Drive • Area 18 – Lynn Garden Drive/US 23 Interchange (Both Sides of the Road) • Area 19 – The entire landscaped median of Clinchfield Street from Stone Drive to Lovedale Drive • Area 20 - The entire median of Spring Meadow Court from South Wilcox Drive to Park Meadow Place • Area 21 – Four landscape beds on N. Wilcox Dr. at the CSX railroad bridge. • Area 22 – Two landscape beds at 1895 Moreland Dr. at the City of Kingsport’s Road Salt Storage Shed. Across the road from Evergreen Home and Garden Center. • Area 23 – All landscaped and tree planted areas at Preston Park located at 2665 Suffolk St. • Area 24 – All landscaped and tree planted areas in the parking lot at Riverwalk Park located on W. Industry Dr.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents