Similar Projects
Happy Hollow Park and Zoo Lower Zoo Electrical Improvements - City of San Jose
Alteration
Conception
San Jose, CA

Police Athletic League Stadium Electrical Improvements - City of San Jose
Renovation, Infrastructure
Conception
$2,220,000 est. value
San Jose, CA 95116

Engine and Generator Repair Services
Term Contract
Sub-Bidding
San Jose, CA 95113

High Voltage Testing Repair
Alteration
Post-Bid
Sunnyvale, CA

Generator Overhaul and Maintenance Services
Term Contract
Post-Bid
Santa Clara, CA 95054

Low or Medium Voltage Electrical Repairs
Term Contract, Alteration
Results
Less than $200,000 est. value
San Jose, CA

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Cooperage Emergency Generator
Alteration
Post-Bid
$709,907 est. value
San Jose, CA

CRC Battery Storage Project
Alteration
Results
$500,000 est. value
Morgan Hill, CA 95037

Stationary Generator Services
Term Contract
Post-Bid
Milpitas, San Jose, Santa Clara, CA 95050

City Hall Backup Generator
Alteration
Results
Gilroy, CA 95020

Department of Public Safety Emergency Generator Replacement
Alteration
Post-Bid
Sunnyvale, CA 94086

Battery Backup Unit Upgrades
Alteration
Results
CA

Operation and Maintenance for City-Owned Solar Systems
Term Contract
Post-Bid
Santa Clara, CA

Cubberley New Electrical Service
Alteration
Results
$200,000 est. value
Palo Alto, CA 94303

Last Updated 11/17/2022 12:07 PM
Project Title

CHP San Jose Area Office, Electrical Installation Services

Physical Address View project details and contacts
City, State (County) San Jose, CA 95131   (Santa Clara County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The IFB was cancelled due to the best interest of the state. Electrical Installation Services Prevailing wage applies DIR registration is required Mandatory walk through Questions Due November 3, 2022 @ 2:00 p.m Bidders shall submit questions via email to KRISTAL GOODELL at Kristal.goodell@chp.ca.gov The Department of California Highway Patrol (CHP), San Jose Area Office, is in need of Electrical Installation Services. Contractor must provide the services described herein: furnish all supplies, materials, tools, equipment, labor, personnel, and supervision; pay all taxes, insurance, bonds, license and permit fees, and all other direct and indirect costs necessary to provide concrete installation service 1. Contractor shall supply a 50-amp 120/240 volt, single phase electrical feed to the Conex box in the secured parking lot. 2. Contractor shall provide a 50-amp breaker for service to the Conex box (if needed). 3. Contractor shall provide the electrical feed to originate from the designated panel in main building electrical room, or new sub-panel as required. 4. Contractor shall run 1" conduit with three (3) #4AWG wire and one (1) #8AWG ground. Actual footage to be determined at bid walk. 5. Contractor shall trench as needed from the electrical room to the Conex box. Actual footage to be determined at the bid walk. 6. Contractor shall install a traffic rated utility box for access if needed at a later date. Exact location to be determined at bid walk. 7. Contractor shall install two (2) extra 1" conduits in the trench, one terminating at the newly installed traffic rated utility box. One will continue through to the interior of the Conex box as a spare if needed at a later date. 8. Contractor shall install a ground rod for the Conex box according to code. 9. Contractor shall back-fill, compact, and replace any concrete or asphalt removed during trenching. Asphalt joints and surfaces in area of excavation shall be sealed after installation. 10.Contractor shall remove all debris and packing material from the job site daily. 11.Contractor shall provide an electrical diagram that fully illustrates the work to be done and the existing conditions for State Fire Marshal (SFM) approval. Refer to the Submittal section, below, for further details. 12.Upon approval by SFM of the electrical diagram, contractor shall attend a preconstruction meeting. 14.Contractor to provide a one (1) year warranty on workmanship as well as the manufacturer's warranty on all components installed.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents