Similar Projects
Last Updated | 11/17/2022 12:07 PM |
Project Title | CHP San Jose Area Office, Electrical Installation Services |
Physical Address | View project details and contacts |
City, State (County) | San Jose, CA 95131 (Santa Clara County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Construction start expected May 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $80,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The IFB was cancelled due to the best interest of the state. Electrical Installation Services Prevailing wage applies DIR registration is required Mandatory walk through Questions Due November 3, 2022 @ 2:00 p.m Bidders shall submit questions via email to KRISTAL GOODELL at Kristal.goodell@chp.ca.gov The Department of California Highway Patrol (CHP), San Jose Area Office, is in need of Electrical Installation Services. Contractor must provide the services described herein: furnish all supplies, materials, tools, equipment, labor, personnel, and supervision; pay all taxes, insurance, bonds, license and permit fees, and all other direct and indirect costs necessary to provide concrete installation service 1. Contractor shall supply a 50-amp 120/240 volt, single phase electrical feed to the Conex box in the secured parking lot. 2. Contractor shall provide a 50-amp breaker for service to the Conex box (if needed). 3. Contractor shall provide the electrical feed to originate from the designated panel in main building electrical room, or new sub-panel as required. 4. Contractor shall run 1" conduit with three (3) #4AWG wire and one (1) #8AWG ground. Actual footage to be determined at bid walk. 5. Contractor shall trench as needed from the electrical room to the Conex box. Actual footage to be determined at the bid walk. 6. Contractor shall install a traffic rated utility box for access if needed at a later date. Exact location to be determined at bid walk. 7. Contractor shall install two (2) extra 1" conduits in the trench, one terminating at the newly installed traffic rated utility box. One will continue through to the interior of the Conex box as a spare if needed at a later date. 8. Contractor shall install a ground rod for the Conex box according to code. 9. Contractor shall back-fill, compact, and replace any concrete or asphalt removed during trenching. Asphalt joints and surfaces in area of excavation shall be sealed after installation. 10.Contractor shall remove all debris and packing material from the job site daily. 11.Contractor shall provide an electrical diagram that fully illustrates the work to be done and the existing conditions for State Fire Marshal (SFM) approval. Refer to the Submittal section, below, for further details. 12.Upon approval by SFM of the electrical diagram, contractor shall attend a preconstruction meeting. 14.Contractor to provide a one (1) year warranty on workmanship as well as the manufacturer's warranty on all components installed. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |