Similar Projects
Academica K - 12 Charter School
New Construction
Conception
Royal Palm Beach, FL 33411

Crystal Lakes Elementary Renovations
Renovation
Design
Boynton Beach, FL 33472

Poinciana Elementary Renovations
Renovation
Design
Boynton Beach, FL 33435

CMAR Services for Facilities Renovations and Repair - H.L. Johnson Elementary School
Renovation
Bidding
$4,556,912 est. value
Royal Palm Beach, FL 33411

Construction Management Services for Facilities Renovation and Repair a Golden Grove
Renovation
Bidding
$4,595,077 est. value
West Palm Beach, FL 33411

South Olive Elementary School
Post-Bid
West Palm Beach, FL 33405

North Grade Elementary School
Post-Bid
Lake Worth, FL 33460

Core Expansion at Del Prado Elementary School
Results
Less than $2,690,000 est. value
Boca Raton, FL 33433

Modular Classroom Relocation - Various Sites
Term Contract
Results
$500,000 est. value
FL

Construction Management at Risk Services for Facilities Renovations and Repair
Renovation
Construction
$4,526,923 to $4,712,783 est. value
Lantana, FL

Washington Elementary School Modernization
Construction
West Palm Beach, FL 33404

Contractor Prequalification Program
Term Contract
Bidding
FL

Citrus Cove Elementary School Core Expansion
Post-Bid
Less than $2,690,000 est. value
Boynton Beach, FL 33436

Grove Park Elementary School
Results
$16,560,000 est. value
Palm Beach Gardens, FL 33410

Starlight Cove Elementary
Construction
Less than $4,900,000 est. value
Lantana, FL 33462

Reported 08/14/2021 12:00 AM
Project Title

Grove Park Elementary School Swing Site

Physical Address View project details and contacts
City, State (County) Palm Beach Gardens, FL 33410   (Palm Beach County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work consists of the preparation and infrastructure for the modular classroom installations for the temporary holding site and the PEW Center renovation. Work involves Site Work and Site Utilities, Sod Replacement and Irrigation, Chain Link Fencing, Selective Demolition, Concrete Foundations, Roof Patching, Floor Patching, Cleaning and Waxing, Drywall, Repainting, Acoustical Ceiling, Misc. Signage, Aluminum Walkway Canopies, Bike Racks, Plumbing, and Electric.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents