Similar Projects
Water Station 5 Reservoirs and Pump Station
Infrastructure
Bidding
$28,250,000 est. value
Vancouver, WA 98687

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Bidding
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Post-Bid
$380,000 est. value
Bothell, WA 98011

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Improvement of Middle Waitsburg Road MP 6.10 To MP 7.92
Infrastructure
Results
Walla Walla, WA 99362

SR 14, I-205 to SE 164th Avenue Auxiliary Lanes
Infrastructure
Bidding
WA

Lake City Land Banked Site Park
Demolition, Infrastructure, Alteration
Post-Bid
Seattle, WA 98125

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Bidding
WA

Puyallup Avenue Transit - Street Improvements
Infrastructure
Post-Bid
$100,000 est. value
Tacoma, WA

Johnson Area Roads Overlay
Infrastructure
Results
$487,238 est. value
Aberdeen, WA 99111

I-5, NB Marine View Drive to SR 529 - Corridor and Interchange Improvements Project
Infrastructure
Bidding
WA

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

SR 167,I-5 to SR 509 - New Expressway
Infrastructure
Bidding
$325,000,000 to $375,000,000 est. value
WA

Reported 09/23/2021 01:47 PM
Project Title

Pump Stations 19 and 31 Upgrades Special Inspection and Testing Services

Physical Address View project details and contacts
City, State (County) Silverdale, WA   (Kitsap County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Lift and Pump Stations, Masonry, Paving/Reconstruction, Pumps and Wells, Water Lines
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $4,750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items or elements of construction include: Pump Station 19 Upgrades PS 19 is a triplex, submersible type pump station located near the intersection of Nels Nelson Road NW and NW Bucklin Hill Road in Silverdale, Washington. The upgrades will include modifications to the existing wet well and construction of a new CMU control building. Upgrades will also include underground piping, miscellaneous site work and grading. Pump Station 31 Upgrades PS 31 is a duplex, submersible type pump station located in a cul-de-sac off Clover Blossom Lane NE in Bremerton, Washington. The upgrades will include new wet well, valve vault and concrete retaining wall. Upgrades will also include installation of new force main along Clover Blossom Lane NE., HMA patching, miscellaneous site work and grading. Scope of Work: Special Inspection and Testing Services tasks and responsibilities will include: • Special Inspections and Materials Testing and requisite laboratory work to ensure that the materials and workmanship on the project comply with the specifications, drawings and all applicable codes. Inspections and testing will include the following elements: * Soil materials testing and in-place compaction * Asphalt paving inspection * Reinforcing bar, concrete placement and taking of concrete test specimens * Expansion anchor installation * Anchors installed using epoxy adhesive * Masonry construction • Prepare a preliminary written field report of activities performed at each site visit and submit a legible copy of such report to Kitsap County and the General Contractor before leaving the project site. • Maintain a current up-to-date “Non-Compliance Log” and submit to the County’s Construction Manager each time the status of the log changes. • Certify all field reports and testing reports prepared and submit to the County’s Construction Manager. • Submit copies of all reports and certifications to the Kitsap County Department of Community Development’s authorized representative in accordance with the Building Permit(s).

Details

Lift and Pump Stations, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents