Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Keller-Heavenly Water System Improvements Project, Phase 3
Infrastructure
Bidding
$3,900,000 est. value
South Lake Tahoe, CA

2022 Road Rehabilitation Project
Infrastructure
Bidding
$1,800,000 to $2,400,000 est. value
South Lake Tahoe, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Roadway Excavation Place Hot Mix Asphalt and Plastic Pipe
Infrastructure
Results
$870,000 est. value
CA

Camino Intertie Pressure Reducing Station
Infrastructure
Results
$650,000 to $700,000 est. value
Placerville, CA

Auburn Lake Trails Paving Projects
Infrastructure
Bidding
$2,000,000 est. value
Cool, CA 95614

Place Polyester Concrete Overlay
Infrastructure
Post-Bid
$1,650,000 est. value
CA

Hot Mix Asphalt (Hma) Concrete Grinder Dig Out Repair and Replacement Paving
Infrastructure
Results
Placerville, CA

Asphalt Patch Paving
Term Contract
Post-Bid
Placerville, CA

2022 Bijou 2/3 Waterline Replacement Project
Infrastructure
Results
$2,165,707 est. value
South Lake Tahoe, CA

Asphalt Patching Services
Infrastructure
Post-Bid
$500,000 est. value
South Lake Tahoe, CA

Clean Culverts, Install Cured-in Place-Pipeliners and Invert Paving
Infrastructure
Results
$6,700,000 est. value
CA

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Last Updated 06/07/2022 06:27 AM
Project Title

Tahoe Valley Stormwater and Greenbelt Improvement Project, Phase 1

Physical Address View project details and contacts
City, State (County) South Lake Tahoe, CA   (El Dorado County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,250,000 to $7,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed includes, but is not limited to: traffic control, pavement saw-cutting, removal and disposal of existing AC pavement, milling of existing AC pavement surfaces, tree removal, construction staking, earthwork grading, off-haul of earthen materials and tree stumps, grading & compaction, new concrete curb, storm drain pipe removal, adjust utilities to grade, water service line relocations, storm drain system construction (drainage inlets, storm drain laterals, storm drain main, and treatment basins), sanitary sewer lateral relocations, installation of permeable roadside shoulder treatments, AC paving, pavement striping and signage, temporary erosion control Best Management Practices, compliance with regulatory permits, establishing revegetation over water quality basin sites and areas disturbed by construction activity, and all other work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents