Similar Projects
Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

Bledsoe County East Valley Road Water Line Extension (Phase II)
Infrastructure
Bidding
$600,000 est. value
TN

Water Line Replacement, Palisades Road
Infrastructure
Bidding
Signal Mountain, TN 37377

CDBG 2019 Wastewater Collection Improvements
Post-Bid
Rockwood, TN

Moccasin Bend WWTP Equalization Basin And Blower Replacement Improvements
Post-Bid
Chattanooga, TN 37405

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

24-Inch Water Transmission Main
Infrastructure
Bidding
Loudon, TN

Fire Hydrants, Valves, and Parts Replacement
Term Contract
Post-Bid
TN

2020 Red Bank Sewer Rehabilitation
Results
Red Bank, TN

Control Valve Installation
Infrastructure
Bidding
$90,000 est. value
Cookeville, TN

Freewill Road/Hensley Road Water Main Improvements
Post-Bid
Cleveland, TN 37312

Snow Hill Road Force Main Repair Phase 1
Results
Less than $77,850 est. value
Chattanooga, TN

Conduit PVC
Term Contract
Bidding
Memphis, TN 37544

Town Center Water Main
Renovation
Post-Bid
White House, TN 37188

Last Updated 02/01/2022 10:35 AM
Project Title

Futrell Alley Water Main Replacement

Physical Address View project details and contacts
City, State (County) Carthage, TN   (Smith County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $180,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will include the following described construction: The furnishing, installing, and testing of 985 linear feet of 6 C900 PVC water main installed by open cut method including all fittings (restrained), valves (restrained), water services reconnections, 6 water main connections, unclassified excavation, backfill, tie-ins, working in close proximity with other utilities, property restoration, pavement restoration, flushing, construction taps, testing, and all other appurtenances and other work as shown on the construction drawings or indicated in the Contract specifications.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents