Similar Projects
Cornucopia - Port Wing Construction / Culvert Replacement
Infrastructure
Conception
$2,000,000 CJ est. value
Ashland, WI 54806

Durand - Mondovi Construction / Resurface
Infrastructure
Conception
$3,000,000 CJ est. value
Alma, WI 54610

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Timeless Timber Site Residential Redevelopment
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Ashland, WI 54806

Perkins Park Ballfield Renovation
Infrastructure
Bidding
$200,000 CJ est. value
Green Bay, WI 54303

Tennis Court Rehabilitation
Infrastructure
Bidding
$200,000 CJ est. value
Green Bay, WI 54304

MAC Dental Center / Ledgeview
New Construction, Infrastructure - 7,078 SF
Sub-Bidding
$2,500,000 CJ est. value
De Pere, WI 54115

Osmosis Plant at the Calumet County Park
New Construction
Post-Bid
Hilbert, WI 54129

Lock and Dam 4 Lower Guide Wall End Cell Project
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Alma, WI 54610

Odden Road and Odden Lane Improvements
Infrastructure
Results
Barronett, WI

Well No. 5 Pump House and Site Improvements
Infrastructure
Results
Lake Hallie, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Last Updated 01/16/2023 09:01 AM
Project Title

Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Osseo, WI 54758   (Trempealeau County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $12,717,777 [brand] Estimate
Plans Available from Copy Center - 12/12/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Construction of a new Wastewater Treatment Plant consisting of rehabilitating existing influent pump station, new fine screening, grit removal, oxidation ditch, final clarifiers, sludge dewatering, sludge dehumidification, associated Operations Building, and associated site work including rehabilitation of existing seepage cells. Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig Iron and Direct Reduced Iron. The Owner encourages MBEs, WBEs, and SBRAs to submit Bid proposals. Download Teams | Join on the web Or call in (audio only) +1 872-242-7640,,931500430# United States, Chicago Phone Conference ID: 931 500 430# Any person monitoring the meeting remotely may be responsible for any documented costs. Message and data rates may apply.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents