Similar Projects
Rohr Road Industrial Development
New Construction
Conception
Columbus, OH 43137

ILPEA Industries/OEM Miller
Addition - 32,680 SF
Conception
Aurora, OH

Self-Storage Facility
New Construction, Demolition - 203,000 SF
Design
Mayfield Heights, OH 44124

Kenect Cleveland
New Construction
Design
Cleveland, OH 44113

Borgo Storage Facility
New Construction - 120,000 SF
Sub-Bidding
$10,000,000 CJ est. value
Akron, OH 44312

Material Storage Building
New Construction
Post-Bid
$130,000 est. value
Trinway, OH 43842

Design of New Public Works Department Office / Garage Building
New Construction, Demolition - 5,420 SF
Post-Bid
Less than $1,225,000 est. value
Loveland, OH 45140

New Parking Lot
Results
Toledo, OH

Columbus Dispatch 400 Ton Salt Storage Facility
Results
Less than $136,300 est. value
Blacklick, OH

Fourth and Walnut Centre
Renovation - 15,000 SF
Construction
$67,000,000 est. value
Cincinnati, OH 45202

Creative Self Storage
New Construction - 90,928 SF
Construction
$2,500,000 est. value
Parma, OH 44130

Eastgate Commercial Park
New Construction - 160,680 SF
Pending Verification
$6,600,000 est. value
Gahanna, OH 43004

Menards Distribution Center
New Construction
Conception
$50,000,000 est. value
North Jackson, OH 44451

CubeSmart
New Construction, Demolition
Design
Willoughby, OH 44094

Y--Loading Dock and Warehouse Improvements 539-19-202
Results
$100,000 to $200,000 est. value
Cincinnati, OH 45219

Last Updated 10/07/2020 11:25 AM
Project Title

Sawmill Parkway Turn Lane Improvements and Salt Storage Facility

Physical Address View project details and contacts
City, State (County) OH   (Delaware County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of left turn lanes on Sawmill Parkway and construction of a reinforced concrete salt storage building with prefabricated fabric covered arch truss roof system, stormwater management facilities and related site improvements.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents