Similar Projects
Leo Kerner Elementary School Renovation
Alteration
Bidding
$500,000 est. value
Lafitte, LA 70067

Repair leaking windows at USCG Sector New Orleans
Alteration
Bidding
$75,000 est. value
New Orleans, LA 70114

A/C and Heat Window Units
Alteration
Post-Bid
LA

Repairing and Replacement of Various Manufacturers and Style of Automatic Doors
Term Contract
Post-Bid
Gretna, LA

Labor, Materials and Equipment Necessary to Replace Overhead Door at Station 13 for the Eastbank Consolidated Fire Department
Alteration
Results
LA

Repair and Replace Passenger Side Door Glass Foer Unit 8443 for the Jefferson Parish Fleet Department
Alteration
Results
LA

Glass Cubicle Door - Milne Admin Building
Alteration
Bidding
$100,000 est. value
New Orleans, LA 70122

Labor, Materials and Equipment Necessary to Provide and Install New Door Operators for the Department of Sewerage
Alteration
Post-Bid
Gretna, LA

Remove and Haul Away Existing Doors and Frames and Install New Doors and Frames for Jefferson Parish Kings Grant Playground
Alteration
Results
Gretna, LA

Repair Roll Up Overhead Door
Term Contract
Post-Bid
New Orleans, LA 70129

To Remove, Dispose and Install the Deck, Patio Doors and Add Patio Covering as Specified for Jefferson Parish Drainage
Alteration
Results
Gretna, LA

Window Refurbishment - DOE
Alteration
Post-Bid
Metairie, LA 70001

Labor, Materials and Equipment Necessary for Two (2) Custom Impact Windstorm Rated Steel Frame Doors for the Jefferson Parish Drainage Department
Alteration
Results
Gretna, LA

Labor, Material, Equipment Necessary to Remove and Replace (1) Roll-Up Door and Track for the East Bank Water Treatment Plant
Alteration
Post-Bid
LA

To Remove Existing Doors, Provide and Install New Doors for the Department of General Service
Alteration
Results
Gretna, LA

Reported 06/01/2022 12:00 AM
Project Title

Glass Replacement

Physical Address View project details and contacts
City, State (County) New Orleans, LA   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $35,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace Glass in customer supplied Frame Mark B-1 1. 1x 3/16" clear Tempered 59-3/4" x 40- 1/4 " 2. 2 x BETASEAL U-428 PLUS URETHANE BLACK 3. 2 X GLASS PRIMER BLACK LABOR-INST. Replace Glass in customer supplied Frame Mark A-1 1. 1x 3/16" clear Tempered 59-13/16" x 40-11/16" 2. 2 x BETASEAL U-428 PLUS URETHANE BLACK 3. 2 X GLASS PRIMER BLACK LABOR-INST. Replace Glass in customer supplied Frame Mark C-1 1. 1x 3/16" clear Tempered 66-7/8" x 34-9/16" 2. 2 x BETASEAL U-428 PLUS URETHANE BLACK 3. 2 X GLASS PRIMER BLACK LABOR-INST.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents