Similar Projects
Last Updated | 10/07/2020 08:51 AM |
Project Title | Chloride Tank Removal and Replacement-2020 |
Physical Address | View project details and contacts |
City, State (County) | Bloomfield, MI (Oakland County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Fuel/Chemical Tanks and Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal of a Belding Tank Model C-CCR-8-11979, with a capacity of 11,979 gallons. The replacement shall be three, Belding Tank Technologies FRP chemical storage tanks, model C-FSV-I-10-6267, equivalent or better. One of these tanks shall be dedicated to storing brine solution, the other two shall be linked together for storing liquid calcium chloride. Plumbing shall be parallel for the two systems to an appropriate point near the pump to where a three-way ball valve shall be installed, along with appropriate supports, anchors and fittings to switch between the off position, and the position for each system to be pumped into equipment for usage. The proposal shall include labor to remove and replace the existing tank, remove the existing steel cradle, grind down the concrete bases for the cradle, to a point necessary to maintain the base for the pipe support, replacement of the waterproof membrane, electrical work and connection to existing plumbing. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |