Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Dever Golf Cart Sales and Service Center
New Construction, Infrastructure - 16,630 SF
Conception
$2,500,000 CJ est. value
Louisville, KY 40245

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Langley Bullock Industrial Development / Hebron
New Construction, Infrastructure - 230,000 SF
Design
$123,510,000 CJ est. value
Hebron, KY 41048

Improvements at Former Jacks Creek Pike Landfill
Infrastructure
Bidding
$400,000 CJ est. value
Lexington, KY 40508

Walnut Hill Elementary Addition
Infrastructure - 2,260 SF
Bidding
$150,000 CJ est. value
Liberty, KY 42539

Engineering Services for Bridge Design - Buffington Bridge Replacement
New Construction, Renovation
Post-Bid
Elsmere, KY

Piling/Drilling
Infrastructure
Post-Bid
Catlettsburg, KY

Distribution System Site Development
Renovation
Results
Burgin, Harrodsburg, KY 40330

Baseball Field Backstop Safety System
Results
Union, KY 41091

Murray-Calloway County Hospital Re-Roofing
Renovation
Construction
Murray, KY 42071

Arby's / Versailles
New Construction, Infrastructure - 2,460 SF
Construction
$800,000 CJ est. value
Versailles, KY 40383

Old New Cut Road Apartments
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Fairdale, KY 40118

Blackburn Avenue Multi-Residential Development
New Construction, Infrastructure - 24,816 SF
Pending Verification
$6,000,000 CJ est. value
Lexington, KY 40508

Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Last Updated 10/24/2022 05:32 PM
Project Title

Elkhorn City Wastewater Collection Improvements Project

Physical Address View project details and contacts
City, State (County) Elkhorn City, KY 41522   (Pike County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $876,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of rehabilitation of approximately 4,300 linear feet of sanitary sewer piping, twenty five (25) manholes and lift station. The Owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit their bid security in the amount, form and subject to the conditions provided in the Information for Bidders. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246, Title VI and other requirements. Minority and Female Owned bidders are encouraged to bid. No bidder may withdraw their bid within 30 days after the actual date of the opening thereof.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents