Similar Projects
Multiple School Security Upgrades Boulder City High School , Burk Horizon / South Academic Center, Mission High School, Peterson Academic Center
Infrastructure, Renovation
Bidding
$6,000,000 CJ est. value
Boulder City, NV 89005

Culinary Kitchen Phase 1 - Moapa Valley High School
Renovation
Post-Bid
$103,000 est. value
Henderson, Moapa Valley, NV 89021

New Robotics Lab Southeast Career and Technical Academy
New Construction
Post-Bid
$300,000 est. value
Las Vegas, NV 89120

Construction of Global Community High School and Global Intake Center
New Construction - 79,255 SF
Results
$33,000,000 est. value
Las Vegas, NV 89110

SE Career and Technical Academy (SECTA) Phase III Gymnasium
New Construction - 61,333 SF
Results
$23,753,080 est. value
NV

Coral Academy of Science
New Construction - 105,000 SF
Construction
$30,000,000 est. value
Henderson, NV

Collaboration Center Foundation
New Construction - 6,300 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Las Vegas, NV 89113

Delta Academy - Interior Classroom
Renovation
Post-Bid
$150,000 est. value
North Las Vegas, NV 89030

Advance Planning Odyssey Charter School Tenant Improvement
Renovation - 4,300 SF
Results
$500,000 est. value
Las Vegas, NV 89146

South Career and Technical Academy
New Construction
Post-Bid
$150,000,000 est. value
Henderson, NV

Phase III of Phased Replacement Sandy Valley High School Addition
Addition
Results
$14,600,000 est. value
Goodsprings, NV 89019

Culinary Portable Relocation Peterson Academic Center
Renovation
Post-Bid
$243,500 est. value
Las Vegas, NV 89149

Robotics Classroom Tenant Improvement (T.I.) Southeast Career and Technical Academy
Renovation
Results
$300,000 est. value
Henderson, NV

CSN Historic Westside School Dialysis Class Remodel Suite 118 Tenant Improvement
Renovation
Post-Bid
Las Vegas, NV 89106

Losee Academy Bleachers
New Construction
Post-Bid
$80,000 est. value
North Las Vegas, NV 89030

Last Updated 12/11/2022 11:03 PM
Project Title

Clark County School District - HVAC

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89157   (Clark County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected June 2018
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 6, 2017, this project is in early programming. A bid for a general contractor won't take place until the second quarter of 2018. No construction timeline has been established at this time.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents