Similar Projects
3 Year Contract for Streetlight Maintenance
Term Contract
Bidding
Northampton, MA

Annual Repair and Maintenance of the City's LED Streetlights
Infrastructure
Bidding
Less than $18,000 est. value
Northampton, MA

LED Streetlight Installation
Post-Bid
Buckland, Carver, Freetown, Mattapoisett, West Springfield, MA

LED Streetlight Installation
Post-Bid
Buckland, Carver, Freetown, Mattapoisett, West Springfield, MA

Scheduled and Emergency Highway Lighting Repairs and Improvements at Various Locations
Results
Less than $998,725 est. value

Scheduled and Emergency Highway Lighting Repairs and Improvements at Various Locations
Results
Less than $998,725 est. value

Streetlight Maintenance
Infrastructure
Bidding
Lexington, MA

Repairs of Municipal Street Lighting/Parking Lot System
Post-Bid
Less than $145,000 est. value
Chelsea, MA

Lighting Repairs and Improvements in the Central Artery Tunnel (I-93) (CRC 17D and 17F)
Results
Less than $26,224,000 est. value
Boston, MA 02108

Lighting Repairs and Improvements in the Prudential Tunnel
Infrastructure
Bidding
$32,266,395 est. value
Boston, MA

LED Streetlight Installation
Post-Bid
Less than $280,000 est. value
Boston, MA 02111

Scheduled and Emergency Highway Lighting Repairs and Improvements at Various Locations
Results
Less than $183,140 est. value

Upgrade of Existing LED Street Lights
Post-Bid
Chelsea, MA 02150

Maintenance Service for Traffic Signals, Traffic Control Devices and Street Lights
Results
Less than $95,000 est. value
Arlington, MA

SLE - 54W LED Street Lights
Post-Bid
Boston, MA

Last Updated 07/07/2021 09:30 AM
Project Title

Highway Lighting Repairs and Improvements at the Interchange of Interstates 93 and 495

Physical Address View project details and contacts
City, State (County) Andover, Tewksbury, MA (Essex, Middlesex Counties)
Category(s) Outdoor Lighting
Sub-Category(s) Roadway Lighting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,470,099
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule of Operations - Fixed Price $42,000","100." "1.000","Ls","as-built Survey and Plans","100.9" "0.500","a","Selective Clearing and Thinning","102." "50.000","Cy","Earth Excavation","120." "100.000","Cy","Test Pit for Exploration","141.1" "20.000","Cy","Class B Rock Excavation","144." "50.000","Cy","Ordinary Borrow","150." "1.000","Ls","Environmental Health and Safety Program","180.01" "80.000","Hr","Personal Protection Level C Upgrade","180.02" "80.000","Hr","Licensed Site Professional Services","180.03" "30.000","Ton","Disposal of Unregulated Soil","181.11" "30.000","Ton","Disposal of Regulated Soil - in-state Facility","181.12" "12.000","Ton","Disposal of Regulated Soil - Out-of-state Facility","181.13" "1.000","Ton","Disposal of Hazardous Waste","181.14" "5320.000","Gal","Treatment of Contaminated Groundwater","183.1" "1000.000","Lb","Disposal of Granular Activated Carbon","183.2" "1.000","Ls","Testing of Pcb Ballasts","188.1" "1.000","Ls","Disposal of Pcb Ballasts","188.2" "40.000","Ea","Disposal of Mercury Containing Lamps","188.3" "50.000","Ft","Drive Sample Boring","191." "10.000","Ft","Core Boring","191.11" "1250.000","Ft","Horizontal Directional Drilling","191.311" "15.000","Ton","Temporary Asphalt Patching","472." "5800.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "9.000","Ea","Trailing Anchorage","627.1" "4.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "12.000","Ea","Transition to Nchrp 350 Guardrail","628.21" "1.000","Ea","Transition to Thrie Beam","628.25" "15.000","Ea","Impact Attenuator for Interchange Infield Incapable of Redirection","628.311" "100.000","Ft","Highway Guard Removed and Reset","630." "320.000","Ft","Highway Guard Removed and Discarded","630.2" "50.000","Ft","Chain Link Fence Removed and Reset","666." "48.000","Ea","Silt Sack","697.1" "26.000","Mo","Engineers Field Office and Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "800.000","Cy","Loam Borrow","751." "7700.000","Sy","Seeding","765." "15700.000","Ft","Sediment Control Barrier","767.121" "6460.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "14000.000","Ft","3 Inch Electrical Conduit - Type Nm (Double)","801.32" "2500.000","Ft","3 Inch Electrical Conduit - Type Nm (Triple)","801.33" "440.000","Ft","2 Inch Electrical Conduit Type Nm - Plastic (Ul)","804.2" "550.000","Ft","1 Inch Electrical Conduit Type Rm Steel (Plastic Coated)","808.1" "61.000","Ea","Electric Handhole - Sd2.022","811.22" "48.000","Ea","Electric Handhole - Sd2.023","811.23" "59.000","Ea","Electric Handhole Removed and Discarded","811.391" "6.000","Ea","Junction Box 18 X 12 X 8 Inches","811.71" "34.000","Ea","Light Standard Foundation Sd3.013","812.13" "7.000","Ea","Light Standard Foundation Sd3.014","812.14" "5.000","Ea","Light Standard Foundation 80 Ft High Mast","812.161" "7.000","Ea","Light Standard Foundation 100 Ft High Mast","812.162" "3300.000","Ft","Wire Type 8 No. 10 Direct Burial","813.40" "31500.000","Ft","Wire Type 8 No. 6 Direct Burial","813.42" "62000.000","Ft","Wire Type 8 No. 2 Direct Burial","813.44" "34000.000","Ft","Wire Type 8 No. 1/0 Direct Burial","813.46" "1450.000","Ft","Wire Type 10 No. 10 Grounding and Bonding","813.521" "460.000","Ft","Wire Type 10 No. 6 Grounding and Bonding","813.522" "10500.000","Ft","Wire Type 10 No. 2 Grounding and Bonding","813.524" "6300.000","Ft","Wire Type 10 No. 1/0 Grounding and Bonding","813.526" "1.000","Ls","Highway Lighting Service Connection 1 (Overhead)","813.801" "1.000","Ls","Highway Lighting Service Connection 2 (Overhead)","813.802" "2.000","Ft","Footing Cost Adjustment","815.98" "30.000","Ea","Highway Lighting Pole 40 Ft or Less (Anchor Base) 8 Foot Bracket","821.121" "4.000","Ea","Highway Lighting Pole 40 Ft or Less (Anchor Base) Twin 8 Foot Bracket","821.221" "7.000","Ea","Highway Lighting Pole 50 Ft or Less (Anchor Base) Twin 8 Foot Bracket","821.222" "5.000","Ea","Area Lighting Mast Pole or Tower (80-foot Mounting Height)","822.871" "7.000","Ea","Area Lighting Mast Pole or Tower (100-foot Mounting Height)","822.881" "52.000","Ea","Highway Lighting Luminaire 20000 Lumen Led","823.111" "14.000","Ea","Area Lighting Luminaire 40k Lumen Led (High Mast)","823.191" "26.000","Ea","Area Lighting Luminaire 65k Lumen Led (High Mast)","823.192" "8.000","Ea","Underpass Lighting Led Luminaire - Wall Mounted","823.361" "1.000","Ls","Highway Lighting Load Center No.1","823.61" "1.000","Ls","Highway Lighting Load Center No.2","823.62" "2.000","Ea","Demolition of Highway Lighting Load Center","823.63" "40.000","Ea","Highway Lighting Pole and Luminaire and Base Removed and Discarded","823.72" "13.000","Ea","Delineation for Guard Rail Termini","833.7" "180.000","Day","Traffic Cones for Traffic Management","851.1" "800.000","Sf","Safety Signing for Traffic Management","852." "17400.000","Ft","Temporary Barrier Removed and Reset","853.21" "1400.000","Ft","Temporary Barrier - Limited Deflection (Tl-3)","853.33" "530.000","Day","Truck Mounted Attenuator","853.403" "40.000","Ea","Temporary Impact Attenuator Removed and Reset","853.501" "3.000","Ea","Temporary Impact Attenuator Unidirectional, Redirective (Tl-3)","853.63" "200.000","Day","Temporary Illumination for Work Zone","853.8" "300.000","Day","Temporary Portable Rumble Strip","854.6" "720.000","Day","Arrow Board","856." "1600.000","Day","Portable Changeable Message Sign","856.12" "20800.000","Day","Reflectorized Drum","859." "400.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "20.000","Sy","Special Slope Paving Under Bridge Removed and Reset","987.02"

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents