Similar Projects
FY 2024 Safe at Home Program
Term Contract
Sub-Bidding
Washington, DC 20036

DCKT-2022-Parking Enforcement System
Term Contract
Sub-Bidding
Washington, DC 20036

Sanitary Sewer Lateral Replacement Contract
Term Contract
Post-Bid
Washington, DC 20036

Job Order Contract (Joc) Systems Consulting Services
Term Contract
Post-Bid
Washington, DC

N036--DC Fire Doors Inspection Repair for Compliance
Term Contract
Sub-Bidding
Washington, DC 20310

Generator Maintenance
Term Contract
Post-Bid
Washington, DC 20036

Fire Alarm Inspection, Preventive Maintenance, and Assessment
Term Contract
Sub-Bidding
Washington, DC 20036

FY22 Flood Smart Homes
Term Contract
Post-Bid
Mountain Top, WA 99328

Indefinite Delivery/ Indefinite Quantity Hazardous Materials for Smithsonian Institution
Term Contract
Post-Bid
Washington, DC 20024

GPO Command Center Project Management
Term Contract
Post-Bid
Washington, DC 20401

Construction Management Technical Support Systems (CMTSS)
Term Contract
Post-Bid
Washington, DC 20036

Water Treatment Services for Boilers and Water Systems
Term Contract
Post-Bid
Washington, DC 20036

FY22 Specialized Residential Services (Jul)
Term Contract
Post-Bid
Washington, DC 20036

On-Call, As Needed Hazardous Material Abatement Services
Term Contract
Post-Bid
Washington, DC 20036

Wastewater Treatment Facility Basic Ordering Agreement
Term Contract
Post-Bid
Washington, DC 20036

Last Updated 07/12/2023 05:14 PM
Project Title

RFP - Construction Management Services for Water & Sewer System Infrasture

Physical Address View project details and contacts
City, State (County) Washington, DC 20036   (District of Columbia County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Proposal Submission Method DC Water Solicitation Application only Regulatory Requirement Service Contract Act Inclusion Program DBE/WBE Inclusion Program Utilization Goals TBD Contract Term 3 Year BAse The purpose of this solicitation is to establish a Construction Management Services (CM) Basic Ordering Agreement (BOA) to support the Department of Engineering and Technical Services. The scope of services and responsibilities for the Professional Services firm shall include the following disciplines, with the expectation that a combination of full time and part time or oncall level of service may be required depending upon the specific project: A. Civil B. Structural C. Plumbing D. Architectural (as needed) E. Process Mechanical (as needed) F. Instrumentation and Control (as needed) G. Electrical (as needed) The task and responsibilities a Professional Services firm will be required to execute are: 1. Design Services 2. Bid Services 3. Construction Services

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents