Similar Projects
Duct Bank Repairs
Alteration
Bidding
$7,000,000 est. value
Boston, MA

Solar and Energy Storage System
Alteration
Bidding
Medford, MA

Furnish and Install Prefabricated Steel Frame and Metals Panel Shed - Sub Bid
Alteration
Sub-Bidding
$253,000 est. value
East Boston, MA

Hot Water Heater Replacement - General Bids
Post-Bid
Less than $500,000 est. value
Tewksbury, MA 01876

Hot Water Heater Replacement - General Bids
Post-Bid
Less than $500,000 est. value
Tewksbury, MA 01876

Upgrade to Norwood Civic Center Elevator - Filed Sub-Bids
Results
Less than $400,000 est. value
Norwood, MA

Renovate 25 Meter Zero Range Tango (Camp Edwards) - Sub-Bids
Results
Less than $1,200,000 est. value
MA

North Village Pole Line
Alteration
Bidding
$560,000 est. value
Amherst, MA

Replacement of Exterior Lighting
Post-Bid
Less than $15,000 est. value
North Attleborough, MA

VFD Portable Unit
Results
Boston, MA 02129

McCormack Renovation And Modernization
Renovation - 13,400 SF
Bidding
$19,854,506 est. value
Boston, MA 02108

Wellesley Municipal Light Plant (WMLP)
Post-Bid
Wellesley, MA

Generator Maintenance
Term Contract
Results
Natick, MA

Electrical Services for all Municipal and School Buildings
Term Contract
Bidding
North Andover, MA 01845

MBTA South Boston Power Complex Transformers
Post-Bid
$2,000,000 est. value
Boston, MA 02116

Reported 02/28/2022 05:09 AM
Project Title

Tisbury School - Temporary Utility Connections for Modular Classrooms Project - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Tisbury, MA 02568   (Dukes County)
Category(s) Single Trades
Sub-Category(s) Electric, Plumbing
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value Less than $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is the renovation of approx. 42,500 GSF of the existing 1929 section of the original building and the 1993 addition to the existing building, partial demolition of the 1939 and 1951 sections of the existing building, and new construction of approx. 32,000 GSF that will provide educational program spaces, a gymnasium, and administrative and support spaces. The 5.15-acre site is located at 40 West William Street in the town of Tisbury, Massachusetts. The construction program will be undertaken while the school remains operational in temporary facilities, using modular classrooms that will be located on a section of the existing site and on an adjacent parcel of land. The modular school will be provided with temporary Utility connections. DCAMM Certification Required.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents