Similar Projects
Last Updated | 10/02/2023 12:34 PM |
Project Title | RFP Contractor - Central Michigan Correctional Facility Ust Ast With Generator |
Physical Address | View project details and contacts |
City, State (County) | Saint Louis, MI 48880 (Gratiot County) |
Category(s) | Government/Public, Sewer and Water |
Sub-Category(s) | Prison/Jail, Storage/Water Tanks |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide professional services for the design and installation of replacement diesel above ground storage tanks ASTs of 1,100-gal capacity to fuel a 500kW generator at full load for 72 hours. Design automatic transfer switch and install that along with the generator that has been previously designed. Remove the three existing underground storage tank UST 2 diesel and 1 gasoline tanks. The scope also includes the design and installation of any associated requirements to meet State and Federal regulations |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |