Similar Projects
Painting SN 059-0009 Carrying IL 4 Over Union Pacific Railroad, 0.9 Miles North of Staunton
Bidding
Staunton, IL

Cleaning and Painting Structural Steel on SN's 037-0029 and 037-0030 Carrying 1-80 Over Mineral Creek Located 0.7 Mile North of US 6, and SN 037-0079 Carrying US 6 Over 1-80
Bidding
IL

2020 Light Pole Painting
Post-Bid
Algonquin, IL 60102

Village Hall Painting
Post-Bid
Volo, IL 60073

Cleaning and Painting Existing Steel on the Structures Carrying, Michigan Ave. over 1-55, in the South Chicago Township, and Roosevelt Road Over IHB Rail Road
Results
IL

Painting and Cleaning of SN'S 071-0050 Carrying Big Mound Rd Over I-39 Located 1.5 Miles S of Il 72 And 071-0056 Carrying Bethel Rd Over I-39 Located 1 Mile S of Il 64
Results
IL

Cleaning and Painting Structural Steel on SN 037-0112 carrying TR 196-D over 1-80
Bidding
IL

Prospect Pavilion & Gazebo Painting
Post-Bid
Moline, IL 61265

Cleaning and Painting all Structural Steel Components, including Beams/Girders, Diaphragms, Cross and Lateral Framing, Bearings, Drains, Angle Brackets, Steel Handrails When Present
Results
IL

Cleaning and Painting Structural Steel SN's 081-0030 and 081-0031 Carrying I-280 Over Case Creek Located 2.0 Miles West of I-74
Bidding
IL

Water Tower Interior Painting
Post-Bid
Fox River Grove, IL 60021

Wendell Phillips Academy HS
Results
Less than $1,000,000 est. value
Chicago, IL 60602

Cleaning and Painting Structural Steel on SN 052-0059 Carrying Welland Road over 1-39
Bidding
IL

McCook Max Exterior Painting
Post-Bid
Less than $200,000 est. value
McCook, IL 60525

Salt Creek Greenway Trail Pedstrian Bridge Painting And Staining
Renovation
Results
Wood Dale, IL 60191

Last Updated 04/21/2021 04:42 PM
Project Title

2021 University Housing Maintenance Painting

Physical Address View project details and contacts
City, State (County) Normal, IL   (McLean County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complete maintenance painting during the summer turnover process. This will occur in all residence halls and UHS-owned properties. Contractor will provide all labor, equipment, and materials (i.e. patching, materials, plaster, primer, finish paint, brushes, rollers, etc.) required to paint all student apartments, corridors, and stairways on all floors noted in schedule. Please refer to the attached painting schedule. Contractor will submit a bid for the patching and painting as specified in these specifications in the following areas: student rooms (defined as any room with a mattress), kitchen, living rooms, and bathrooms.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents