Similar Projects
Dorothea Dix Park Gateway Plaza and Play
Design
Less than $34,000,000 est. value
Raleigh, NC 27601

Rock Quarry Landing
New Construction
Post-Bid
$34,000,000 est. value
Raleigh, NC

Pullen Park Exhibit - Design, Fabrication, and Installation
Post-Bid
Raleigh, NC 27601

Enloe High School Track Replacement
Results
Raleigh, NC 27610

J.B. Flaherty Dog Park Upgrades
Results
Wake Forest, NC 27587

Pleasant Park
Construction
Less than $36,000,000 est. value
Apex, NC 27502

Wooten Meadow Park Phase 1 Construction
Construction
Less than $1,381,230 est. value
Raleigh, NC 27604

North Carolina Freedom Park
New Construction
Pending Verification
$3,000,000 est. value
Raleigh, NC 27601

Tennis Court Repairs at Scott Northern Wake Campus
Post-Bid
Raleigh, NC 27603

Playground Renovation at Fred G. Bond Metro Park
Results
Less than $400,000 est. value
Cary, NC 27513

Playground Equipment
Post-Bid
Morrisville, NC 27560

Knightdale High School Track Replacement
Results
Less than $877,861 est. value
Knightdale, NC 27545

2020 Poured in Place Surface Replacement at Method Community Park Playground
Post-Bid
Raleigh, NC 27601

Wakefield High School Track Replacement
Results
Raleigh, NC 27614

Urinal Installation at Walnut Creek
Post-Bid
Raleigh, NC 27610

Last Updated 09/02/2021 01:40 PM
Project Title

Crabtree Creek West Greenway

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project begins on Ebenezer Church Road at the crossing of Crabtree Creek and ends at the existing greenway terminus and trailhead parking area on Lindsay Drive. The project consists of construction of approximately 1.8 miles of 12’ wide concrete and asphalt multi-use path which will be the final greenway connection to Umstead State Park. Also, it includes five (5) prefabricated steel bridges and one (1) suspension bridge. In addition to these structures there are segments of fencing, signage, concrete decked boardwalk, retaining walls and trailhead parking lot.

Details

Park/Playground, Addition.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents