Similar Projects
Sand Spring Run Stream Bank Restoration
Design
Stroudsburg, PA

Pipe
Post-Bid
Rome, Wysox, PA 18837

Reed Road Culvert Replacement Project
Post-Bid
New Castle, PA 16101

Doyle Avenue Landslide Repair
Results
PA

Butternut Lane Culvert Project
Results
Millville, PA 17846

Frame, Park Grate
Post-Bid
Philadelphia, PA 19107

SR 866 Culvert Rehabilitation Project
Results
Williamsburg, PA

Furnish and Install a Precast Reinforced Concrete Box Culvert and Associated Items on Elm Street in Arnot
Post-Bid
Arnot, PA 16911

Gettysburg Road Drainage and Widening Project Phase II
Results
Littlestown, PA

Laurel Lake Road
Post-Bid
Columbia Cross Roads, PA 16914

Reconstruction of Mckinley Street Wall
Results
Export, PA

Besley Road
Post-Bid
Columbia Cross Roads, PA 16914

Green Forest Drive Culvert Replacement Project
Results
Baden, PA

1,526 LF 6 Inch Pipe Underdrain, Installed
Post-Bid
Indiana, PA 15701

Scott Township CD 44 7.5 Georges Run Stream Restoration
Results
Pittsburgh, PA

Last Updated 04/23/2021 06:52 AM
Project Title

PA 655 Under 8 Feet Culverts

Physical Address View project details and contacts
City, State (County) Waterfall, PA   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $999,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is the replacement of five existing pipe culverts at different locations along the SR 0655 corridor. Work includes the replacement of the existing pipe culverts with slightly larger pipes culverts at the same location. The pipes culverts will have endwalls constructed on both the inlet and outlet side and includes guide rail and other miscellaneous construction as indicated on the approved drawings included in the bid package for State Route 0655, Section 007, In Fulton County, Taylor Township. This project is located on a 7-mile section of SR 0655 in Fulton County between Hustontown and the Village of Waterfall. 0201-0001lump Sum1.000 01**Na Clearing And Grubbing 0203-0001cubic Yard329.000 01**Nc Class 1 Excavation 0204-0001cubic Yard61.000 01**Nc1, h Class 2 Excavation 0205-0263cubic Yard63.000 01**Nc1 Selected Borrow Excavation Rock, Class r-3 0205-0264cubic Yard16.000 01nc1 Selected Borrow Excavation Rock, Class r-4 4205-0266cubic Yard14.000 02**Nyesc1proj Selected Borrow Excavation Rock, Class r-6 , Choked With Natural Streambed Material 4205-0267cubic Yard4.000 01nyesc1std Selected Borrow Excavation Rock, Class r-7 Choked With r-4 0212-0014square Yard1,364.000 01**Nc3, h, m2 Geotextile, Class 4, Type a 0213-0002dollar1,000.000$1.00$1,000.0001**Yz Temporary Project Air Pollution Control 0313-0322square Yard6.000 02ne Superpave Asphalt Mixture Design, Base Course, Pg 64s-22, < 0.3 Million Esals, 25.0 Mm Mix, 4" Depth 0313-0328square Yard349.000 01**Ne Superpave Asphalt Mixture Design, Base Course, Pg 64s-22, < 0.3 Million Esals, 25.0 Mm Mix, 7" Depth 0313-0335square Yard658.000 03**Ne Superpave Asphalt Mixture Design, Base Course, Pg 64s-22, < 0.3 Million Esals, 25.0 Mm Mix, 11 " Depth 0350-0106square Yard1,409.000 01**Nc, e Subbase 6" Depth (No. 2a) 0350-0120cubic Yard200.000 01**Nc, e Subbase (No. 2a) 0413-0193square Yard1,171.000 01**Nf Superpave Asphalt Mixture Design, Wearing Course, Pg 64s-22, < 0.3 Million Esals, 9.5 Mm Mix, 1 1/2" Depth, Srl-g 0413-2059ton69.000 01**Nf Superpave Asphalt Mixture Design, Wearing Course (Leveling), Pg 64s-22, < 0.3 Million Esals, 9.5 Mm Mix, Srl-l 0460-0003square Yard2,336.000 01**Nf4 Asphalt Tack Coat (Ntt/Cntt) 0461-0001square Yard2,177.000 01**Nf4 Asphalt Prime Coat 0491-0014square Yard1,165.000 01**Nf3 Milling Of Asphalt Pavement Surface, 2 1/2" Depth, Milled Material Retained By Contractor e0601-0551linear Foot124.000 01**Nh 24" Thermoplastic Pipe, Group Vii, 12`-2` Fill, 100 Year Design Life o0601-7028linear Foot124.000 01**Nh 24" Reinforced Concrete Pipe, Type a, 15` - 2` Fill, 100 Year Design Life e0601-0552linear Foot66.000 04nh 30" Thermoplastic Pipe, Group Vii, 12`-2` Fill, 100 Year Design Life o0601-7043linear Foot66.000 04nh 30" Reinforced Concrete Pipe, Type a, 15` - 2` Fill, 100 Year Design Life e0601-0554linear Foot76.000 02nh 42" Thermoplastic Pipe, Group Vii, 12`-2` Fill, 100 Year Design Life o0601-7066linear Foot76.000 02nh 42" Reinforced Concrete Pipe, Type a, 15` - 2` Fill, 100 Year Design Life e0601-0555linear Foot76.000 05nh 48" Thermoplastic Pipe, Group Vii, 12`-2` Fill, 100 Year Design Life o0601-7073linear Foot76.000 05nh 48" Reinforced Concrete Pipe, Type a, 15` - 2` Fill, 100 Year Design Life 0605-2642each2.000 01nk Type d Endwall For 24" Pipe 0605-2644each2.000 04nk Type d Endwall For 30" Pipe 0605-2677each2.000 02nk Type d-w Endwall For 42" Pipe 0605-2678each2.000 05nk Type d-w Endwall For 48" Pipe 0605-2730set1.000 03nk Type m Concrete Top Unit And Grate 0605-2750set1.000 03nk Type d-h Concrete Top Unit And Grates 0605-2850each1.000 03nk Standard Inlet Box, Height < /= 10` 0605-2882each1.000 03nk Type d-h Inlet Box, Height < /= 10` 0608-0001lump Sum1.000 01**Nx Mobilization 0609-0003lump Sum1.000 06nx Inspector`s Field Office And Inspection Facilities, Type b 0609-0009lump Sum1.000 06nxstd Equipment Package 0619-0470each3.000 01**Nj1, j3 Permanent Impact Attenuating Device, Type Ii, Test Level 3 (Energy Absorbing Terminals, Tangent) 0620-0400each6.000 02**Nj Terminal Section, Single 0620-0402each1.000 02nj Terminal Section, Bridge Connection 0620-0500linear Foot400.000 01**Nj Reset Guide Rail 0620-0503linear Foot3,913.000 01**Nc1, j Remove Existing Guide Rail (Contractor`s Property) 0620-0575linear Foot25.000 02nj Guide Rail Element 0620-0872each6.000 01**Nj Buried-In-Backslope Terminal, Single Panel 0620-1600linear Foot2,263.000 01**Nj Type 31-s Guide Rail 0620-1601linear Foot1,200.000 01**Nj Type 31-s Guide Rail With 7` Extra Length Posts 0620-1602linear Foot125.000 05nj Type 31-s Guide Rail With 8` Extra Length Posts 0620-1627linear Foot75.000 02nj Type 31-Sc Guide Rail With 8` Extra Length Posts 0620-1638linear Foot13.000 02nj Type 31-Scc Guide Rail With 8` Extra Length Posts 0620-1670each6.000 02**Nj Type 31-Strong Post In-Line Anchor 0677-0001cubic Yard6.000 02nc1, e Selected Material Surfacing 0686-0020lump Sum1.000 01**Nx Construction Surveying, Type b 0689-0001lump Sum1.000 02nx Narrative Schedule 0690-0001dollar1,000.000$1.00$1,000.0002yx Internal Facilitation 0703-0024cubic Yard987.000 01**Nc1, h No. 2a Coarse Aggregate 0804-0004pound8.000 01**Nm3 Seeding - Formula e, Including Mulch 0804-0006pound45.000 01**Nm3 Seeding And Soil Supplements - Formula l, Including Mulch 0804-0007pound1.000 05nm3 Seeding And Soil Supplements - Formula w, Including Mulch 0806-0113square Yard868.000 01**Nm2 Temporary Short-Term, Rolled Erosion Control Product, Type 2d 0810-0052each14.000 01**Na, m1 Selective Tree Removal 0811-0003linear Foot215.000 04**Nj2, m Temporary Protective Fence 0845-0001dollar1,000.000$1.00$1,000.0001**Ym2 Unforeseen Water Pollution Control 4855-0003each1.000 05nyesm2proj Pumped Water Filter Bag Water Discharge 0855-0004each1.000 05nm2 Replacement Pumped Water Filter Bag 0860-0000each1.000 03nm2 Inlet Filter Bag For Type m Inlet 0867-0012linear Foot468.000 01**Nm2 Compost Filter Sock, 12" Diameter 0901-0001lump Sum1.000 01**Nqstd Maintenance And Protection Of Traffic During Construction 0901-0240square Foot300.000 01**Nq, r Additional Traffic Control Signs 0901-0451each4.000 02nq 3-Line Changeable Message Sign Without Telecommunications 0937-0114each69.000 01**Nj, r Guide Rail Mounted Delineator Type d, (w/w) 0962-1000linear Foot15,094.000 01**No 4" White Waterborne Pavement Markings 0962-1005linear Foot15,094.000 01**No 4" Yellow Waterborne Pavement Markings 9000-0020lump Sum1.000 05nc1, h, m2std Temporary Channel Diversion 9000-0091each1.000 02nrstd Covid-19 Safety Plan Sign 9000-5100lump Sum1.000 02nxstd Electronic Ticketing System

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Concrete Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents