Similar Projects
On-Call Concrete Services
Term Contract
Post-Bid
Olivette, MO

Sunset Hills Selected Slab Replacement Package
Alteration
Post-Bid
$800,000 est. value
Sunset Hills, MO

Public Works Salt Storage Slab
Alteration
Results
Olivette, MO 63132

2022 Concrete Street Slab Replacement
Alteration
Results
Crestwood, MO

2022 Hazelwood Asphalt Improvements Project
Infrastructure
Construction
$320,000 CJ est. value
Hazelwood, MO 63042

Quazite Pull Boxes and Lids
Alteration
Post-Bid
Clayton, MO

2022 Concrete Slabs
Alteration
Results
Ballwin, MO

Concrete and Brick Removal / Replacement and Complete Sidewalk Replacement
Infrastructure, Alteration
Post-Bid
$687,130 est. value
Saint Louis, MO

Concrete Pre Mix
Term Contract
Results
$12,000 est. value
Chesterfield, MO

Polymer Concrete
Term Contract
Post-Bid
Ballwin, MO 63011

Concrete Slab Replacements-Spring Valley Woods
Infrastructure, Alteration
Results
$350,000 est. value
Des Peres, MO

Infrastructure Restoration and Repair - North Half of Kirkwood
Infrastructure
Post-Bid
$500,000 CJ est. value
Kirkwood, MO 63122

2022 Concrete Repair and Restoration
Alteration
Results
$200,000 est. value
Breckenridge Hills, MO 63114

District Concrete And Wall Projects
Renovation
Post-Bid
$400,000 CJ est. value
Webster Groves, MO 63119

Concrete and Asphalt Repair/Replacement
Infrastructure, Alteration
Results
$100,000 est. value
Florissant, MO

Last Updated 04/22/2023 01:31 PM
Project Title

Portland Cement Concrete Sidewalks And Curb Ramps

Physical Address View project details and contacts
City, State (County) Des Peres, MO 63131   (Saint Louis County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $170,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work consists of the removal and replacement of approximately 12,000 SF of concrete sidewalk slabs and approximately 30 curb ramps in Dougherty Ridge and Dougherty Woods subdivisions. Sidewalk replacement with the goal of replacing all trip hazards throughout the neighborhood. The scope may be reduced in order to stay within the budget. Traffic control and other incidental items shall be included as shown in the specifications. It is anticipated that work will take place in April/May 2023, as weather allows. Not less than the prevailing hourly rate of wages shall be paid to all workers performing under this Contract in this area according to the rates determined by the Department of Labor and Industrial Relations of the State of Missouri. A bid security in the amount of ten percent (10%) of the bid amount must accompany each bid in accordance with the Instructions to Bidders. The City reserves the right to accept or reject any bid and to waive any irregularities in the best interest of the City.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents