Similar Projects
Brownsville Transit Village - Phase V
New Construction - 99,854 SF
Conception
$26,711,893 est. value
Miami, FL 33142

San Sebastian Inland Harbor
New Construction - 50,118 SF
Conception
$80,000,000 est. value
Saint Augustine, FL

Bay Harbour Marina Village
New Construction - 30,000 SF
Design
$10,000,000 CJ est. value
Fort Myers Beach, FL 33931

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

The Reserve at Jensen Beach
New Construction
Sub-Bidding
$21,250,000 est. value
Jensen Beach, FL 34957

Hallandale Oasis
New Construction, Build-Out - 93,910 SF
Sub-Bidding
$370,000,000 est. value
Hallandale, FL 33009

Orange Avenue Apartments
New Construction, Demolition
Post-Bid
$11,000,000 est. value
Tallahassee, FL

Hilltop Apartments
Renovation
Post-Bid
Madison, FL 32340

Esplanade On Palmer Ranch
New Construction
Construction
$10,000,000 CJ est. value
Sarasota, FL 34240

Hollywood East
New Construction, Build-Out
Construction
$48,650,000 est. value
Hollywood, FL 33020

Varadero
New Construction - 2,456,798 SF
Conception
$10,000,000 CJ est. value
Sunny Isles, FL

Atlantic 3350
New Construction - 647,925 SF
Design
$85,000,000 est. value
Pompano Beach, FL 33062

Via Mizner
New Construction - 730,000 SF
Construction
$63,651,007 est. value
Boca Raton, FL 33432

Auburn Village - Winter Haven
New Construction
Conception
Auburndale, FL 33823

Resorts World Miami
New Construction, Renovation
Design
Miami, FL 33132

Reported 04/21/2020 12:00 AM
Project Title

Vacant Units Remodel

Physical Address View project details and contacts
City, State (County) Dade City, Hudson, New Port Richey, FL   (Pasco County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The following are example of the work to be completed, but is not limited to: 1.Cleaning – removal of debris, cleaning appliances, floors, fixtures, windows, remove smoke from walls(if applicable), etc.; for vacant unit cleaning refer to Section 3: Specifications 2.Repairs as specified on the check list for each unit (Attachment A). Repairs might include some or all ofthe following: a.Install new flooring in the whole apartment b.Install new cabinets with new sink and faucet c.Walls knock out texture in complete apartment d.Install new tub e.Install new sink with faucet, medicine cabinets, mirror f.Install new tiles around bathtub g.Replace toilet h.Replace Water heater i.Paint complete unit including walls, ceiling, baseboards, doors, etc. j.Install lightning fixtures k.Install ceiling fans. l.Repair holes in walls m.Change doors n.Install new hardware in doors o.Among others

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents