Similar Projects
Williamson Boulevard and Strickland Range Road Intersection Improvements
Infrastructure
Bidding
$2,635,360 est. value
Daytona Beach, FL 32116

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Ponce De Leon Inlet, North Jetty Rehabilitation and Aid to Navigation Replacement, Volusia County, Florida
Results
$5,000,000 to $10,000,000 est. value
FL

Design/Build H Matthew Waterfront Repair, STA Ponce De Leon Inlet, USCG Station New Smyrna Beach, FL
Results
$1,000,000 to $2,000,000 est. value
New Smyrna Beach, FL

Drainage Repair
Results
Less than $300,000 est. value
FL

49 Lantana Drive Drainage Improvements
Results
DeBary, FL

Plaza Boulevard Beach Approach Improvements - Phase 1
Results
Less than $562,087 est. value
Daytona Beach, FL 32118

2021 Storm Lining
Results
Ormond Beach, FL 32175

Lake Beresford/Lakeside Drive Stormwater Improvements
Results
Less than $557,000 est. value
De Land, FL

Corrugated Pipe
Results
Less than $10,140 est. value
Ormond Beach, FL 32174

Aluminum and Steel Culvert Pipe
Results
FL

Small Scale Stormwater Improvement Project No. 7
Results
Less than $277,489 est. value
DeBary, FL 32713

Tomoka Farms Road Landfill Class III Stormwater Improvements
Results
Less than $2,600,000 est. value
Port Orange, FL 32128

Aluminum and Steel Drainage Pipe
Results
FL

Last Updated 02/21/2022 08:09 AM
Project Title

Ariel Canal Water Quality Improvement

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32116   (Volusia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The retrofit of an existing stormwater facility that will divert storm and base flow from Ariel Canal into a wet detention pond and provide additional treatment through a biologically active media system.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents