Chase Tank - City of Corona
Infrastructure
Conception
$6,000,000 CJ est. value
Corona, CA 92879

Main Library Remodel - 16-08 - City of Palm Springs
Demolition, Build-out, Infrastructure
Conception
$9,738,000 CJ est. value
Palm Springs, CA 92262

Dave's Hot Chicken / Cathedral City
Demolition, New Construction, Infrastructure - 2,675 SF
Design
$800,000 CJ est. value
Cathedral City, CA 92234

Dinah Shore Drive Multi-Residential and Self Storage Facility
New Construction, Infrastructure
Design
$55,000,000 CJ est. value
Rancho Mirage, CA 92270

RFQ Contractor - Water, Sewer and Water Reclamation Projects
Term Contract
Sub-Bidding
Corona, CA 92879

Fire Station No. 2 Rebuild - City of Corona
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Corona, CA 92879

RFP - Construction Management and Inspection Service for Citywide Pavement Rehabilitation Program Fiscal Year 2021-22 (Local Streets), and Pavement Rehabilitation
Infrastructure
Post-Bid
$509,000 CJ est. value
Moreno Valley, CA 92557

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Construction of Bogert Trail Sewage Lift Station
Infrastructure
Construction
$2,342,139 CJ est. value
Palm Springs, CA 92264

Hillcrest HS Portables
New Construction, Infrastructure
Construction
$587,000 CJ est. value
Riverside, CA 92503

Amanda Ave and Winchester Road Mixed-Use
New Construction, Infrastructure - 7,550 SF
Pending Verification
$3,300,000 CJ est. value
Riverside, CA 92522

Wingsweep Parcels at Sommers Bend
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Temecula, CA 92590

BNSF Quiet Zone - Mission Inn Avenue, 3rd Street, and Spruce Street - 8610 - City of Riverside
Infrastructure
Conception
$3,200,000 CJ est. value
Riverside, CA 92501

Rehabilitate Mainline Pavement, Shoulders and Ramps
Infrastructure
Design
$191,557,000 CJ est. value
Riverside, CA 92506

Last Updated 06/30/2023 08:01 PM
Project Title

Replacement of Ion Exchange Treatment Plant No. 7991

Physical Address View project details and contacts
City, State (County) Mecca, CA 92254   (Riverside County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $9,478,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

IE 2001 The project will dismantle the existing, non-functioning IXTP 7991 arsenic removal system, and replace it with a single pass adsorption media treatment system. The new treatment system is comprised of the following: a pre-filtration system, steel pressure adsorber vessels, chemical feed and injections systems, process piping, above ground tanks, and a backwash recycle system. In addition, the onsite well will be equipped with a new pumping plant, emergency electrical generator, new electrical building, and other site improvements. The new arsenic removal facility will be capable of treating approximately 1,500 gallons per minute (gpm). The existing well will require redevelopment and has experience artesian conditions in the past. Online Q&A Yes Q&A Deadline 10/25/2022 5:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Estimated Bid Value $7,000,000.00 Liquidated Damages $1,200 per day Response Format Electronic Project Type Bid Response Types Line Items General Attachment (required) Type of Award Lump Sum License Requirements Class A, C57, and C22 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For further information, contact Jesse Aguilar, 760-398-2661, Ext. 2511, and j agui Iar@cvwd. org or Dan Ruiz, 760-398-2661, Ext. 2288, and druiz@cvwd.org . Project Duration 600 Calendar Days 1. Clear and grub, fence removal and replacement, removal and disposal of existing containerized treatment equipment and storage units, and site grading/preparation as required by the Contract Document. 2. Site improvements, minor grading, trenching, fencing, aggregate driveway, curb replacement, existing utility modifications and new onsite and offsite utility installations. 3. Procurement of new vertical turbine lineshaft well pump, discharge head, vertical hollow-shaft motor, and associated discharge piping, control valves, casing vent, and field instrumentation devices necessary to re-equip existing Well 7991. 4. Procurement and installation of a new adsorptive media-based Arsenic Removal Treatment System including bag filter pre-filtration system, steel vertical horizontal pressure adsorber vessels, chemical feed storage, feed, and injection systems, process piping, above ground tanks, hydropneumatic tank, backwash recycle pumps, and related structural support foundations. 5. Procurement and installation of Sodium Hydroxide and Sulfuric Acid Feed Systems including bulk storage tanks, chemical feed dosing pumps, dual containment piping, inline static mixers, injection quills, and pH analyzer/ controller systems. 6. Procurement and installation of Calcium Hypochlorite Disinfection Feed System including packaged automated tablet feeder, solution tank, and solution feed pump skid with local PLC-based control system, dual containment piping, injection quills, and Free Chlorine analyzer system. 7. Installation of new reinforced concrete mat foundation systems with engineered geogrid subgrade preparation for new treatment equipment and outdoor backwash recycle storage tanks and steel canopy structures, and new new masonry treatment building housing a new 500 kW diesel standby generator set, electrical and control room, and chemical feed room. Special excavation, subgrade preparation, and backfill are required in accordance with the Drawings and per the Geotechnical Soils Reports which are provided in the Appendix to these Specifications. 8. Procurement of material and construction of a masonry block building, reinforced concrete foundation, steel truss and roof deck with built-up tapered insulated roofing system, cooling and ventilation system, windows, doors, plumbing systems all related appurtenances 9. Procurement and installation of new power distribution panels, main disconnect, motor control centers, variable frequency drives with bypass solid-state starter system, redundant PLC-based control system, conduit and wiring, automatic transfer switch, and all other electrical accessories. 10. Procurement and installation of all support instrumentation including coordination with CVWD for interface of the new installed system with the existing CVWD SCADA system. 11. Completion of final grading and installation of storm drainage, access roadways, fencing, and gating. 12. Startup, testing and commissioning of the new pumps, treatment system, piping, mechanical equipment, electrical equipment, instrumentation and all related Work. 13. Comprehensive training of CVWD personnel. 14. Final clean-up, site restoration, and project closeout.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents