Similar Projects
Z2DZ--Renovate and Replace Pharmacy AHUs
Design
$1,000,000 to $5,000,000 est. value
Durham, NC 27705

Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

HVAC Chemical Water and Drain Treatment Services at Durham County Facilities
Bidding
Durham, NC

Phase 1 HVAC Replacement Ramsey Street High School
Bidding
Fayetteville, NC 28301

US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

30-35 Ton Chill Water Unit Rental
Post-Bid
Atlantic Beach, NC 28512

56--Upgrade OA & Exhaust Fans Phase II(VA-19-00005148)
Demolition
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

Brinkley Building Cosmetology HVAC Upgrades
Results
Thomasville, NC

Ronald Wilson Reagan High School HVAC Replacement
Design
Pfafftown, NC 27040

Ledford Middle School Metal Retrofit Roofing Project
Bidding
Thomasville, NC 27361

Durham City Hall HVAC and Electrical Renovations
Post-Bid
Durham, NC

HVAC Maintenance Contract
Term Contract
Results
Less than $713,590 est. value
Dunn, Erwin, Lillington, Spring Lake, NC 27546

Window Replacement and HVAC Upgrades
Bidding
Lexington, NC 27292

Davie County Administration Building Chiller Replacement Project
Post-Bid
Mocksville, NC 27028

HVAC Installation for Building B - Annex
Results
Less than $99,818 est. value
Bolivia, NC 28422

Last Updated 04/22/2021 01:15 PM
Project Title

Replacement of Chiller for 200 Building

Physical Address View project details and contacts
City, State (County) Weldon, NC 27890   (Halifax County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $111,519
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of the one (1) chiller at the 200 Building, all electrical disconnects and related wiring and connections to include the weather tight conduit to the chiller and to the disconnect. The size of the 200 Building chiller is one (1) 110-ton chiller currently. There are a total of two (2) chillers in the 200 Building but the focus of this RFP is just to replace one (1) of the two (2) chillers which is currently non-functional. Provide communication integration to obtain complete functionality with the existing BAS connectivity. The desire is to replace it with an equivalent chiller using standards for a similar sized building for 2021. A separate vendor is responsible for tying in their control system into the new chiller. The new chiller must have a Bac-net card installed from the factory.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents