Similar Projects
2021 Utility, Street and Alley Improvements - Group 1
Bidding
$3,500,000 est. value
New Ulm, MN

2021 Utility, Street and Alley Improvements - Group 1
Bidding
$3,500,000 est. value
New Ulm, MN

Century Middle School Pool Addition - Bid Package 4 - Parking Lot
Post-Bid
Lakeville, MN 55044

Sakatah Singing Hills State Trail Lime Valley Slope Failure
Post-Bid
Less than $356,970 est. value
Mankato, MN

Medina Country Club Sewer Rehabilitation
Results
$108,000 est. value
Medina, MN 55340

Upgrades of ADA Pedestrian Ramps
Results
Minneapolis, MN 55401

City Wide Bike Lane and Laurel Avenue Mill and Overlay
Bidding
$1,350,000 est. value
Golden Valley, MN 55416

Pre-formed Expansion Joint Filler
Term Contract
Post-Bid
Minneapolis, MN

Pond and Storm Sewer Maintenance
Results
Bloomington, Minneapolis, MN

2021 Seal Coat
Bidding
Crosby, Cross Lake, Deerwood, Fifty Lakes, MN

PAMS Cure Compound
Term Contract
Post-Bid
Minneapolis, MN

Centerline Culvert Replacement with Culvert, Approach Grading, Aggregate Base, Bituminous Paving, Aggregate Shouldering and Striping
Results
$296,335 est. value
MN

2021 Micro Surfacing
Bidding
$450,000 est. value
Apple Valley, MN

Glenwood Grade Separation
Renovation
Post-Bid
Minneapolis, MN

Bituminous Milling and Surfacing, Ultrathin Bonded Wearing Course, and ADA Improvements
Results
MN

Last Updated 03/09/2021 12:17 AM
Project Title

CSAH 15 and CR 107 Reconstruction and Surfacing

Physical Address View project details and contacts
City, State (County) Winona, MN   (Winona County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Including Pavement Removal, Excavating & Embankment, Aggregate Base, Storm Sewer, Concrete Curb & Gutter, Retaining Walls, Bituminous Paving, Random Riprap, Traffic Control & Turf Establishment.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents