Similar Projects
Reynoldsburg-New Albany Road Waterline Connections
Post-Bid
Less than $165,000 est. value
Blacklick, OH

State Routes 7 and 148 Water Main Replacements
Post-Bid
Less than $125,000 est. value
Powhatan Point, OH 43942

Glyco II Forcemain Replacement - Contract A
Results
$1,639,924 est. value
Painesville, OH

Construction of Contract 9-19, South Defiance Street & Miller Avenue Waterline
Results
Less than $289,330 est. value
Archbold, OH 43502

Replacement of High Temperature Hot Water (HTHW) Line at Wright-Patterson Air Force Base
Results
$10,000,000 to $25,000,000 est. value
Wright Patterson Air Force Base, OH

2020 A-Water Main Renewal
Results
$4,494,139 est. value
Cleveland, OH 44114

B-Water Main Renewal
Results
$5,273,985 est. value
Cleveland, OH 44114

Mink Pressure District Water Main Improvements and Harrison Road Storm Sewer Improvements
Results
Less than $3,450,000 est. value
New Albany, OH 43054

2020 Water Meters
Results
Westerville, OH

Raymond Elementary School Domestic Water Piping Replacement Summer 2020
Results
Less than $186,704 est. value
Raymond, OH 43067

Ductile Iron and Pipe Fittings Price Agreement
Term Contract
Results
Kettering, OH

Vitrified Clay and PVC Pipe
Results
Cleveland, OH 44114

7th Street Sanitary Sewer Pump Station and Forcemain Project
Results
Waverly, OH

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Watertight Hatch Replacement
Results
Dayton, OH 45414

Last Updated 10/14/2021 09:23 AM
Project Title

AMI Water Meter System

Physical Address View project details and contacts
City, State (County) Circleville, OH 43113   (Pickaway County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of replacing approximately 5,897 water meters for all residential properties serviced by the City's water utility. This turnkey project will include supplying and installing an AMI system, including mounting locations, data transmitters, software, water meters, removing and replacing current water meters, transferring the City's billing system, laptops, and software training.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents