Similar Projects
Watershed Pointe / Divide Highway
New Construction, Infrastructure
Conception
$11,700,000 CJ est. value
Little Rock, AR 72212

The Lofts at Kanis Creek
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Little Rock, AR 72223

Contractor - John L. McClellan (JLM) Memorial Veterans Hospital | RAD Room Site Prep, Room 10
Renovation, Infrastructure
Design
$25,000 to $100,000 est. value
Little Rock, AR 72205

Interstate Battery / Sherwood
Addition, Infrastructure - 3,596 SF
Design
$900,000 CJ est. value
Sherwood, AR 72120

Central Utility Plant Drainage Relocation
Infrastructure
Bidding
$11,067,000 CJ est. value
Little Rock, AR 72202

Construction Managers
New Construction
Post-Bid
Little Rock, AR

Bleacher Layout Revision at LR Central High School
Renovation
Post-Bid
Little Rock, AR 72202

Demolition and Site Clearance of 8 Locations
Demolition, Infrastructure
Results
North Little Rock, AR 72114

Bowman Road and Kanis Road Improvements Project
Infrastructure
Results
$5,753,118 CJ est. value
Little Rock, AR 72211

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Tulip Farms 16 Inch Main Extension Project
Infrastructure
Construction
$803,104 CJ est. value
Little Rock, AR 72201

River City Hydraulics - Lantrip Road
New Construction, Infrastructure - 8,750 SF
Pending Verification
$2,300,000 CJ est. value
Sherwood, AR 72120

Maverick Addition
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
North Little Rock, AR 72117

Hamilton Apartments
New Construction, Infrastructure
Conception
$90,000,000 CJ est. value
Little Rock, AR 72201

Bowman Road Widening - City of Little Rock
Infrastructure
Design
$4,000,000 CJ est. value
Little Rock, AR 72211

Last Updated 06/27/2023 04:15 PM
Project Title

Sylvan Hills Band Room Addition

Physical Address View project details and contacts
City, State (County) Sherwood, AR 72120   (Pulaski County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Sylvan Hills High School Band Room Addition for the Pulaski County Special School District Bidders are instructed to review Section 00 5010 -bid package schedule in the project manual or addendums for a complete description of Trade Contract & Material Supplier Packages. ALL Bid Proposals must be submitted on a copy of the Bid Forms provided in the project manual or addenda. Bidders may photocopy these forms. The entire manual does not need to be submitted with the bids. Faxed and emailed Bid Proposals on Bid Forms will be accepted. Phone Quotes will not be accepted. A 5% Bid Bond or Cashier's Check is required on Trade Contract bids in excess of $50,000 and Material Supplier Contract bids in excess of $100,000. Trade Contract Bids must include the cost of Performance Bond and Payment Bond. Successful Trade Contract bidders will be required to furnish the Performance Bond and Payment Bond on Baldwin and Shell standard bond forms without alteration. Material Supplier Contract bids in excess of $100,000 must include the cost of a Supply Bond. Both the Owner and Construction Manager reserve the right to reject any and all bids, and to waive any formalities *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents