Similar Projects
Stilling Basins
Infrastructure
Bidding
$900,000 est. value
Green Mountain Falls, CO 80819

Cottonwood Creek Channel Rehabilitation Reach 1 and Reach 1B
Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value
Colorado Springs, CO

Manitou Springs Creekwalk Trail Phases 4 and 5 Survey, Row and Design
Post-Bid
Manitou Springs, CO

Flying Horse Pond 1 Retrofit
Infrastructure
Post-Bid
Colorado Springs, CO

Sand Creek Downstream of East Fork Confluence Stream Stabilization
Results
CO

Pikes Peak Greenway Trail Improvements - I25 To Cottonwood
Results
Colorado Springs, CO

Flying Horse Detention Pond 1 Retrofit CM and Geotechnical Engineering Services
Infrastructure
Post-Bid
Colorado Springs, CO

Monument Creek at Talemine Project
Results
$1,000,000 to $1,500,000 est. value
Colorado Springs, CO

Sidewalk and Drainage Improvements on El Monte Place
Infrastructure
Post-Bid
Manitou Springs, CO 80829

Homestake Surge Pond Rehabilitation Project
Results
CO

Black Squirrel Creek Restoration U.S. Air Force Academy
Infrastructure
Post-Bid
USAF Academy, CO 80840

Clear Spring Ranch Facility Drainage Improvements
Alteration
Results
$400,000 to $450,000 est. value
Colorado Springs, CO

North Douglas Creek Channel Restoration
Infrastructure
Post-Bid
$350,000 est. value
Colorado Springs, CO

Slip line and Extend Culvert
Infrastructure
Results
Less than $1,000,000 est. value

Black Squirrel Creek Drainage Improvements
Infrastructure
Results
Colorado Springs, CO

Last Updated 05/24/2022 05:40 PM
Project Title

Claremont Substation - Erosion Mitigation Construction

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To secure services needed at this time for construction and installation of an erosion mitigation system to remedy the current erosion issues and alleviate any future erosion at the Claremont substation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents