Similar Projects
Air Source Heat Pumps to be Installed at the Windsor Town Hall to Provide Heating and Cooling
Alteration
Bidding
$50,000 est. value
Windsor, MA

HVAC Upgrades, Paterson Field House - General Bids
Alteration
Bidding
$850,000 est. value
Pittsfield, MA 01201

Heating System Maintenance, Repairs, And Replacements, Chimney Repairs And Liner Installations
Post-Bid
Pittsfield, MA

Air Vent Cleaning of Aviation Hangars
Post-Bid

HVAC Maintenance for Various Schools
Results
$278,142 est. value
North Adams, MA

Re-Tubing #2 Boiler at Pittsfield High School
Results
$67,450 est. value
Pittsfield, MA 01201

Photovoltaic Systems and Associated Equipment Maintenance, Repair, and Upgrade
Alteration
Bidding
$343,000 est. value

HVAC and Mechanical Products
Term Contract
Post-Bid

Kittredge Elementary School HVAC Controls Retrofit
Results
$45,000 est. value
Hinsdale, MA 01235

Automatic temperature control/ventilation control system - McCann Technical School
Post-Bid
North Adams, MA 01247

Replace Existing Boiler Venting System
Results
Less than $17,000 est. value
North Adams, MA

Installation of Standby Generator
Post-Bid
Lee, MA

Servicing of High Voltage Power Line Systems
Results
Less than $1,000,000 est. value

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Systems Upgrade, Gabriel Abbott Memorial School
Results
Less than $114,000 est. value
Florida, MA 01247

Last Updated 01/03/2022 11:48 AM
Project Title

HVAC Upgrades, Paterson Field House - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Pittsfield, MA 01201   (Berkshire County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Paterson Field House HVAC system upgrade. There is presently no A/C in the building, severe moisture issues warrant it to be installed, simply from a de-humidification standpoint for numerous health and safety reasons. The 4 large heating units in the fitness center and basketball court areas. General Building Construction contractor as prime. DCAMM Certificate Required

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents