Similar Projects
Babcock Trail Apartments
New Construction - 67,766 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Inver Grove Heights, MN 55077

Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Ardan Place Housing Development
New Construction
Design
Rosemount, MN 55068

Lake Minnetonka Care Center
Demolition - 17,983 SF
Design
Minnetonka, MN 55345

Grading/Snow Removal for the 2022/2023 Season
Term Contract, Infrastructure
Bidding
Villard, MN

2022 Cured in Place Pipe Systems (CIPPS)
Infrastructure
Bidding
$200,000 est. value
Owatonna, MN

Talahi and Kennedy Site Improvements 2021
Post-Bid
Waite Park, MN

Thompson County Park General Site Improvements
Post-Bid
$1,400,000 est. value
West Saint Paul, MN 55118

Wabasha County CSAH 26 Road Improvements
Results
Wabasha, MN

Regional Drinking Water Project Contract A - Wells 7 and 8 Construction
Renovation - 156,816 SF
Results
Cloquet, MN 55720

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Erik's Transmission
New Construction - 1,056 SF
Construction
MN

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

Invicta Training Center
Renovation - 22,000 SF
Pending Verification
Bloomington, MN 55438

Harvest Housing Development
New Construction
Design
Chaska, MN 55318

Last Updated 04/13/2022 10:29 AM
Project Title

ISD 11 High School Multipurpose Fields

Physical Address View project details and contacts
City, State (County) Anoka, MN   (Anoka County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of multipurpose fields at Andover High School, Blaine High School, Champlin Park High School, and Coon Rapids High School. Specific work includes removals, earthwork, concrete curb and flat work, retaining walls, paving, athletic equipment, grass restoration, and other work as shown on the Contract Drawings.

Details

Athletic Facility, New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents