Similar Projects
Washburn Rural Middle School Renovation
Renovation - 96,000 SF
Conception
$7,500,000 est. value
Topeka, KS 66619

New Middle School
New Construction - 146,000 SF
Design
$46,500,000 est. value
Topeka, KS

Washburn Rural High School New CTE, Multipurpose Room & Renovations
New Construction, Renovation - 82,000 SF
Design
$27,500,000 est. value
Topeka, KS 66619

Coffeyville Field Kindley High School and Roosevelt Middle School, Renovation and Addition
Renovation, Addition
Post-Bid
Coffeyville, KS 67337

Baxter Springs HS Science Classroom Remodel
Renovation
Post-Bid
Baxter Springs, KS 66713

2021 Shawnee Mission North High School and Northwest
Renovation
Results
Overland Park, KS 66202

Construction Management At-Risk Services
New Construction
Results
Inman, KS

Kansas Wesleyan University Student Housing
New Construction - 1,656 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Salina, KS - Kansas City, MO

Replacement of Santa Fe Trial Middle School
New Construction
Pending Verification
Olathe, KS

Tallgrass New Multipurpose Room
New Construction - 1,200 SF
Design
$500,000 est. value
Topeka, KS

Louisburg High School Addition and Renovation
Renovation, Addition - 11,420 SF
Post-Bid
Louisburg, KS 66053

Prairie Hills School
Renovation, Addition - 12,000 SF
Results
Sabetha, Wetmore, KS 66534

Renovation of High School Media Centers
Renovation
Pending Verification
Olathe, KS

Replacement and Improvements to the Shot Put Area and the Broad Jump Pit in the Steve Grogan Stadium at Ottawa High School
New Construction
Post-Bid
Ottawa, KS 66067

Mill Valley High School Soccer Bleacher Expansion
Renovation
Results
Shawnee, KS 66226

Reported 05/05/2022 12:00 AM
Project Title

Salina RAD Homes, LP

Physical Address View project details and contacts
City, State (County) Salina, KS 67401   (Saline County)
Category(s) Education, Residential
Sub-Category(s) Dormitory, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $425,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Middle/Senior High School, New Construction, Dormitory, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents