Similar Projects
July 2023- June 2024 Residential Water Shut Off (B-box) Replacement
Renovation
Sub-Bidding
$600,000 CJ est. value
Park Forest, IL 60466

Zurn Plumbing Supplies
Alteration
Post-Bid
IL

Emergency Plumbing Repairs
Term Contract
Post-Bid
Oak Park, IL

CPS Phillips MEP
Alteration
Results
Chicago, IL

Downtown Unit 299 Main Street
Alteration
Results
Park Forest, IL

Private Side Lead Service Line Replacement Plumber
Alteration
Post-Bid
Evanston, IL

CPS Holden ES Elevator and Toilet Room
Renovation
Results
$2,500,000 est. value
Chicago, IL 60608

North Palos 2022 Capital Improvements - Bid Release #2
Renovation, Alteration
Post-Bid
Hickory Hills, Palos Hills, IL 60457

CPS Fuller ES - Dubois ES MEP and FP Renovations
Renovation, Alteration
Results
Chicago, IL 60653

Plumbing Supplyhouse
Term Contract
Post-Bid
Less than $25,000 est. value
River Forest, IL 60305

CPS Cameron - Madison MEP and FP Renovations
Renovation
Results
IL 60651

2022 Backflow Testing and Repairs
Alteration
Post-Bid
Elgin, IL

CPS Addams ES - Ariel CS MEP
Alteration
Results
Chicago, IL 60617

On-Call / Emergency Services - Plumbing
Alteration
Post-Bid
Cicero, IL

CPS Whistler ES MEP / Wacker Roof
Alteration
Results
Chicago, IL 60643

Last Updated 03/15/2023 11:34 AM
Project Title

93 Green Bay Road Site Development

Physical Address View project details and contacts
City, State (County) Winnetka, IL 60093   (Cook County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $514,536 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 15, 2023, project was awarded to A Lamp Concrete Contractors, Inc., awarded amount is $514,535.90. The Work under this Contract shall consist of site and streetscape improvements on and along the 93 Green Bay Road property in Winnetka Illinois, located on the southeast corner of Green Bay and Winnetka Avenue. The work includes installation of electrical infrastructure, pavement milling and resurfacing, local base repair, with pavement excavation and reconstruction, curb & gutter removal and replacement, sidewalk removal and replacement, adjusting/replacing frames and grates/lids, rehabilitation and replacement of sanitary manholes, and related collateral work. This project also includes the installation of parkway trees and landscaping, light poles, planter pots, benches, and other streetscape items. The Work shall be performed at the following Work Site: The property commonly referred to as 93 Green Bay Road as well as the adjacent Green Bay Road right-of-way. Owner reserves the right to make clarifications, corrections, or changes in this Request for Contract Proposals at any time prior to the time proposals are opened. All bidders or prospective bidders will be informed of said clarifications, corrections, or changes. If any prospective bidder has questions or comments about this Request for Proposals, contact James Bernahl, Director of Engineering/Village Engineer at jbernahl@winnetka.org by 3:30 P.M, February 20, 2023. Commencement Date: May 15, 2023 Completion Date: August 4, 2023

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents