Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Circuit Compressor Replacement on HVAC Chiller Unit
Post-Bid
Richmond, VA

Replace Kitchen Exhaust Hood System
Results
Chesterfield, VA

Fire Restoration Services - Creighton
Results
Richmond, VA

Preventative Maintenance Heating and Cooling Systems
Term Contract
Post-Bid
Richmond, VA

Baseboard Heaters Installation
Results
Richmond, VA

J--Cooling Towers Preventative Maintenance
Post-Bid
Richmond, VA 23249

JTCC-M Physical Plant Warehouse AC Upgrades
Results
Midlothian, VA

Rooftop Air Handling Unit Repair at Gordon Elementary School
Post-Bid
VA 23236

DVS Sitter and Barefoot Veterans Care Center - Chiller Temporary Connection
Results
Richmond, VA 23219

Rooftop Heat Pump Replacements
Post-Bid
Bon Air, Chester, Chesterfield, Richmond, VA 23237

Replacement of HVAC Equipment at Carver Middle School
Results
Chester, VA 23831

Cooling Tower Replacements
Post-Bid
Chester, VA 23831

HVAC, Chiller Refurbish at Meadowbrook High School
Results
VA

Z--Replace HVAC System Project 652-17-102
Post-Bid
$1,000,000 to $2,000,000 est. value
Richmond, VA 23249

Last Updated 12/06/2018 11:10 AM
Project Title

HVAC Equipment Replacement Public Safety Training Facility and ECC Building

Physical Address View project details and contacts
City, State (County) Chesterfield, VA   (Chesterfield County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center - 10/05/18
Owner View project details and contacts
Architect View project details and contacts
Description Scope of Work: 1. Eanes Pittman Public Training Center: Demolition of a rooftop variable air volume unit and associated controls. Contractor shall provide and install a new rooftop variable air volume unit, controls and support pedestal. Demolition of (2) split system air handling units, refrigerant line sets, hot waterpiping, mechanical room ductwork and controls. Contractor shall provide and install (2) new split system air handling units, refrigerant line sets, hot water piping, mechanical room ductwork and controls. 2. Emergency Communications Center: Demolition of a (2) air cooled chillers, piping and controls. Contractor shall provide and install (2) new air cooled chillers, piping and controls. Demolition of (2) hot water pumps and accessories. Contractor shall provide and install (2) new pumps and accessories. Demolition of (2) humidifiers and accessories. Contractor shall provide (2) new humidifiers, controls and accessories
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents