Similar Projects
Main Street and Fischer Street Improvements
Infrastructure
Bidding
Gresham, WI 54128

North Genesee Street Sidewalk Improvement
Infrastructure
Post-Bid
Wittenberg, WI 54499

City Of Lax - Greenbay Sw And Curb Replacement
Infrastructure
Post-Bid

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Street Rehabilitation
Results
$275,000 est. value
Bonduel, WI 54107

Town of Bartelme, Camp 14 Road, CTH A - Reservation Highway 21
Results
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Summer Street at Village Road Pavement
Results
Aniwa, WI 54408

Lakeview Park Reconstruction
Renovation
Results
Cecil, WI

Wellers Lane Reconstruction
Results
Less than $180,000 est. value

Wittenberg - Shawano, CTH U Intersection
Results
Shawano, Wittenberg, WI

Bonduel - Cecil, Mutzy Lane - STH 22;
Results
Bonduel, WI

CTH U - STH 47, Red River Bridge
Results
WI

Roosevelt Road Resurfacing
Results
Tilleda, WI

Last Updated 02/09/2022 02:28 PM
Project Title

Plaza Improvements

Physical Address View project details and contacts
City, State (County) Shawano, WI   (Shawano County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Construction of approximately 200 linear feet of concrete and asphalt urban street, 1,000 linear feet of concrete curb and gutter, 3,220 square yards of concrete pavement, including colored concrete, 360 linear feet of storm sewer, multiple playground features, two fire tables, a water feature, precast and cast-in-place linear seat walls, lighting, and landscaping.

Details

Park/Playground, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents