Similar Projects
Rushton Groundwater Treatment Plant General and Electrical Contractor Prequalification
Bidding
West Valley City, UT 84119

Regional Water Reclamation Facility (SGRWRF) 2020 Expansion
Post-Bid
Saint George, UT 84770

SLCWRF Main Plant PLC Upgrades
Post-Bid
Less than $44,000 est. value
Salt Lake City, UT 84115

Z--GLCA Hite Marina Water Treatment System
Results
$225,000 to $500,000 est. value
UT 84533

Water Treatment Services for Salt Lake City ARTCC
Results
Salt Lake City, UT 84116

Water Treatment Plant Chiller Replacement
Renovation
Construction
Provo, UT 84602

Sodium Permanganate System
Post-Bid
Salt Lake City, UT 84104

Construct the Duchesne Valley Water Treatment Plant (DVWTP) Process Improvement Project
Results
Less than $23,000,000 est. value
Duchesne, UT 84021

Coalville Water Treatment Plant
Post-Bid
Coalville, UT 84017

South PRV Station
Results
Less than $2,418,490 est. value
Salt Lake City, UT 84102

Water Treatment Plant Improvements
Post-Bid

Provo WATRR Center Membrane Procurement
Results
Less than $100,000,000 est. value
Provo, UT

Big Cottonwood Water Treatment Plant Sedimentation Basin Rebuild
Results
$1,940,000 est. value
Salt Lake City, UT 84121

South West Chilled Water Plant Distribution Expansion Phase 7
Results
$459,013 est. value
Salt Lake City, UT 84112

Welby Canal Drum Screen
Results
$50,000 to $60,000 est. value
Bluffdale, UT 84065

Last Updated 04/28/2020 01:33 PM
Project Title

Water Reclamation Facility Upgrade

Physical Address View project details and contacts
City, State (County) Hyrum, UT 84319   (Cache County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $3,860,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of upgrade of the existing WRF including removal and replacement of existing influent screens and membrane cassettes. Project will include installation of new RAS pumps, air piping, and diffuser piping.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents