Similar Projects
Santa Fe Avenue and Mesa Avenue Streetscape (CDBG)
Bidding
Pueblo, CO 81008

Statewide Asphalt
Post-Bid

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Master Plan Design for Union Avenue and Main Street
Results
Less than $200,000 est. value
Pueblo, CO 81003

CO CRVFO Roads & Construction IDR 2020
Results
$25,000 to $150,000 est. value

Street Rehabilitation Project - Fortino, Outlook, Greenwood & Eagleridge
Post-Bid
Pueblo, CO 81003

CO LSFO Roads & Construction IDR 2020
Results
$25,000 to $40,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

CO KFO Roads & Construction IDR 2020
Results
$25,000 to $170,000 est. value

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Platteville Boulevard Turn Lanes
Results
Pueblo West, CO 81007

US 50 From Purcell Blvd to Pueblo Blvd
Results
$20,000,000 est. value
CO

Capistrano Turn Lanes
Results
Pueblo, CO 81007

Pueblo West Safe Routes to School
Results
Pueblo, CO 81007

Spaulding Roundabout
Results
$500,000 to $600,000 est. value
Pueblo West, CO 81007

Last Updated 11/20/2019 08:03 AM
Project Title

Installation Of New Storm Sewer, Inlets, Manholes, Asphalt Patching, Concrete Patching

Physical Address View project details and contacts
City, State (County) CO   (Pueblo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located in Region 2 in Pueblo county. The project work entails installation of new Storm Sewer, inlets, manholes, asphalt patching, concrete patching and other as described in the plans and specs. The limits of the project are 23rd Lane between US50C and Everett Road. 202-00220 Removal of Asphalt Mat 2,665.000 SY 202-05026 Sawing Asphalt Material (6 Inch) 5,958.000 LF 203-01597 Potholing 100.000 HOUR 212-00006 Seeding (Native) 1.000 ACRE 601-06150 Concrete (Patching) 377.000 SF 603-01185 18 Inch Reinforced Concrete Pipe (Complete In Place) 224.000 LF 603-01365 36 Inch Reinforced Concrete Pipe (Complete In Place) 76.000 LF 603-01545 54 Inch Reinforced Concrete Pipe (Complete In Place) 2,450.000 LF 604-30015 Manhole Slab Base (15 Foot) 9.000 EACH 620-00002 Field Office (Class 2) 1.000 EACH 625-00000 Construction Surveying 1.000 L S 626-00000 Mobilization 1.000 L S 630-00000 Flagging 300.000 HOUR 630-00012 Traffic Control Management 69.000 DAY 630-80355 Portable Message Sign Panel 6.000 EACH

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents