Similar Projects
Molholm Elementary - 2018 Bond - Jefferson County Public Schools
Addition, Renovation, Infrastructure
Conception
$6,409,000 CJ est. value
Lakewood, CO 80214

Hidden Lake Improvements - Hyland Hills Park and Recreation District
Infrastructure, Renovation
Conception
$300,000 CJ est. value
Arvada, CO 80003

Murphy Express #8904
New Construction - 2,800 SF
Design
Arvada, CO 80007

Denver Gateway Filing 4
Infrastructure
Design
$1,000,000 CJ est. value
Lakewood, CO 80228

Belmar - Lakewood
New Construction, Infrastructure - 379,578 SF
Bidding
$70,000,000 CJ est. value
Lakewood, CO 80226

State Highway 93 and State Highway 72 Roadway Widening
Infrastructure
Bidding
$3,000,000 CJ est. value
Arvada, CO 80007

Whisper Village
New Construction, Alteration
Post-Bid
Arvada, CO

CSP Conference Center Bldg 83
Demolition, Build-out, Infrastructure - 1,548 SF
Post-Bid
$300,000 CJ est. value
Golden, CO 80401

Horizontal Directional Drilling Services
Infrastructure
Results
$50,000 est. value
Golden, CO

West Colfax Sculpture Walk Site Improvements
Infrastructure
Results
Less than $60,000 est. value
Lakewood, CO 80214

Murphy Express #8947
New Construction - 2,800 SF
Construction
Lakewood, CO 80215

Colorado Research Exchange (CoRE)
New Construction, Infrastructure - 450,000 SF
Construction
$60,000,000 CJ est. value
Broomfield, CO 80021

The Lock at Flatiron
New Construction, Infrastructure - 1,425 SF
Pending Verification
$20,000,000 CJ est. value
Broomfield, CO 80021

ACTIV Apartments at Southwest Plaza
New Construction, Infrastructure
Pending Verification
$108,000,000 CJ est. value
Littleton, CO 80123

West 100th Avenue and Simms Intersection Improvements - City of Westminster
Infrastructure
Conception
$2,764,000 CJ est. value
Westminster, CO 80005

Last Updated 04/21/2023 10:13 AM
Project Title

Jiffy Lube #4029 / Westminster

Physical Address View project details and contacts
City, State (County) Westminster, CO 80021   (Jefferson County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status No longer Accepting Requests, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

*KTK General Contracting Limited was not awarded. Project Type Ground Building with Complete Site Work Package Project Scope: 3,438 SQ FT Project Start Date 2Q 2023 Project Duration 80 Days

Details

1 Story Above Grade, 3,438 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents