Similar Projects
Reconstruct Runway 1-19
Results
Less than $3,900,000 est. value
Orange, MA 01634

Plymouth Municipal Airport - Taxiway E Extension
Post-Bid
Less than $1,100,000 est. value
Plymouth, MA 02360

Rehabilitation of Runway 14-32, Taxiways J/J1 and Other Airfield Improvements
Results
$9,000,000 est. value
East Boston, MA

Taxiway November Rehab Edge Lighting and Associated Improvements
Results
$1,434,000 est. value
Bedford, MA 01730

Construct Taxiway D (200' X 35') Andrunway Approach Obstruction Removal
Bidding
Norwood, MA

Design-Bid-Build Terminal C Main Roadways
Bidding
$72,000,000 est. value
East Boston, MA

Nantucket Memorial Airport - Reconstruct, Mark, Light and Sign Taxiway E
Results
$18,000,000 to $19,000,000 est. value
Nantucket, MA

Airport Apron Terminal Reconstruction - Phase I
Results
New Bedford, MA 02746

Plymouth Municipal Airport - Relocate Taxiway S
Results
Less than $4,000,000 est. value
Plymouth, MA 02360

Rehabilitation of Runway 9-27 at Logan International Airport
Results
Less than $40,500,000 est. value
East Boston, MA 02128

FY 2021-2023 Runway/Taxiway Safety Area Infield Maintenance Term Contract
Term Contract
Results
Less than $1,000,000 est. value
East Boston, MA

Rehabilitate Taxiway B, Between Former Taxiway F and Taxiway E
Bidding
$2,600,000 est. value
Worcester, MA 01602

Last Updated 03/26/2021 11:25 AM
Project Title

Taxiway Sierra Rehabilitation

Physical Address View project details and contacts
City, State (County) Westfield, MA 01085   (Hampden County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,964,023
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to: removal of existing pavement, placement of full depth hot-mix asphalt pavement, placement of full depth PCC pavement, stripping of topsoil, unclassified excavation, embankment in place, pavement markings, storm drainage improvements including CB`s, dry wells, pre-treatment structures and piping, underground detention and infiltration system, and new taxiway edge lights, junction cans, electrical handholes, guidance signs, regulator and a ALCMS GUI upgrade

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents